Delhi Metro to renovate all 21 stations of Red Line

Share with your network

New Delhi: From exterior beautification to installation of new signages, 21 stations of the Delhi Metro‘s Red Line from Rithala-Dilshad Garden are set to be renovated, officials said. The work on the busy corridor will be carried out in phases, a senior DMRC official said.

Tenders for Renovation of stations

  • The official said,”Renovation work is being taken up on Line 1 covering all the 21 stations (Rithala-Dilshad Garden) in phases.”
  • He said,”Tenders have been finalised for 3 stations — Dilshad Garden, Jhilmil and Mansarovar Park. Tendering for the rest of the stations is in process.”
  • The scope of the work primarily includes exterior facade renovation, which will comprise providing it colour theme, aluminium louvers and structural glazing.
  • The official said,”Among other works, granite flooring will replace the existing terrazzo flooring at concourse and ground floor levels of these stations.”
  • While renovation of stations takes place from time-to-time, this is the first time when such a “large scale renovation” of stations is being undertaken, the official said.
  • The work is expected to be executed within 9 months after finalisation of tenders.

About Red Line

  • The Red Line‘s 8.2-km stretch between Tis Hazari and Shahdara stations was inaugurated on December 24, 2002 by then prime minister Atal Bihari Vajpayee.
  • That segment was thrown open for passenger services the next day, becoming the first operationalised corridor of the Delhi Metro.
  • In these 17 years, the Red Line has expanded to 34.72 km, out of which an over 9 km-section between Dilshad Garden in east Delhi and New Bus Adda in Ghaziabad was inaugurated by Prime Minister Narendra Modi in March.
  • Barring, Shahdara and Welcome stations, which are on surface level, all stations on the Red Line are elevated.

Other works on Red Line

  • The official said,”As part of renovation of stations on the Rithala-Dilshad Garden section, other work will include retro plating (chemical polishing) at platform-level, interior repair and maintenance (cladding).”
  • Officials said, exterior development work, including maintenance, beautification of parking areas, footpath and frontage will also be carried out.
  • New signages as per latest specifications will be installed at these stations.
  • The Official added,”Future activities planned include roof sheeting and structural portals painting, replacing old lighting with LED lights.”

The Delhi Metro‘s total operational network has now expanded to over 343 km, with multiple corridors, and has 250 stations with its footprints in various cities neighbouring Delhi. An average of about 28 lakh commuters use the Delhi Metro every day.

Be the first to comment

Leave a Reply

Your email address will not be published.


*