Mumbai Metro Update: Trial Runs begins on 20-km long stretch from Dhanukarwadi (Line 2A) to Goregaon East (Line 7)
Mumbai Metropolitan Region Development Authority (MMRDA) has started the initial Metro Trial Runs on a 20-km long metro stretch from Dhanukarwadi (Line 2A) to Goregaon East (Line 7). The dynamic testing and trial runs will […]