Search Results for Colaba-Bandra-SEEPZ
Insights on train trial runs of Mumbai metro line-3 Colaba-Bandra-SEEPZ corridor
Train Trial Runs on this fully underground ‘Mumbai Metro Line-3’ corridor is required due to adoption of following new technological improvements in the design of both Rolling Stock and Track. More details: About Train Trial […]
Mumbai Metro-3 Update: MMRC achieves its 41st breakthrough at Mumbai Central Metro station on the Colaba-Bandra-SEEPZ Metro-3 corridor
Mumbai Metro Rail Corporation (MMRC), achieved its 41st Breakthrough on 28th June, 2022 at Mumbai Central Metro Station on the Colaba-Bandra-SEEPZ Metro-3 corridor, Robbins made TBM Tansa-2 completed its downline drive of 832.5 metres from […]
MMRC, MD, Ms. Ashwini Bhide reviews construction work of Mumbai Metro Line 3 project
The Mumbai Metro project construction work progressing at a rapid pace, recently Ms. Ashwini Bhide, MD, MMRC reviewed the remaining construction work at MIDC and Aarey Depot, emphasising the push towards timely completion of these […]
Exclusive Interview With Dr. Sanjay Mukherjee, IAS, Metropolitan Commissioner, MMRDA
Interview Insights: Rail Analysis: Could you provide an update on the current status of the multiple metro lines you are developing in Mumbai? Dr. Sanjay Mukherjee: Metro lines in Mumbai, which are set to become […]
Ambassador of Israel, Mr. Naor Gilon visits Mumbai Metro Line 3 project, strengthening India and Israel cooperation
Mumbai Metro 3 project work progressing at a steady pace, recently the Ambassador of Israel accompanied by Consul General of Israel visited Vidhan Bhavan metro station. They extended gratitude and warm wishes for the operations […]