Search Results for Mumbai Central
MMRC completes 100% tunnelling work at Mumbai Central metro station of Metro Line-3
Mumbai Metro Rail Corporation (MMRC), achieved its 42nd and final Breakthrough on the Colaba-Bandra-SEEPZ Metro-3 corridor at its Mumbai Central Metro Station. More Details: Robbins made TBM Tansa-1 completed its most challenging drive of 837 […]
Hon’ble PM, Shri Narendra Modi to visit Gujarat to inaugurate Phase-1 of Ahmedabad Metro and flag off Gandhinagar-Mumbai Central Vande Bharat Express
Prime Minister Shri Narendra Modi will visit Gujarat today and tomorrow. He will lay the foundation stone and dedicate various projects worth more than Rs. 3400 crore in Surat. Thereafter, the Prime Minister will travel […]
Mumbai Metro-3 Update: MMRC achieves its 41st breakthrough at Mumbai Central Metro station on the Colaba-Bandra-SEEPZ Metro-3 corridor
Mumbai Metro Rail Corporation (MMRC), achieved its 41st Breakthrough on 28th June, 2022 at Mumbai Central Metro Station on the Colaba-Bandra-SEEPZ Metro-3 corridor, Robbins made TBM Tansa-2 completed its downline drive of 832.5 metres from […]
Railway Board officials review unified command & control centre at Mumbai Central
Shri V.K. Tripathi – Chairman & CEO, Railway Board visited the Unified Command & Control Centre (UCCC) at Divisional Railway Manager’s office, Mumbai Central on 1st May, 2022. He was accompanied by Shri Anil Kumar […]
Shri Suneet Sharma, Chairman & CEO, Railway Board visits Western Railway Headquarters and Mumbai Central Division
Shri Suneet Sharma – Chairman & CEO, Railway Board visited Western Railway Headquarters at Churchgate, Mumbai on 7th November, 2021. He chaired the review meeting with Shri Alok Kansal – General Manager of Western Railway, […]
MRIDC to reconstruct 127-year-old Bellasis Road ROB with Cable Stayed Bridge near Mumbai Central Railway Station
The Maharashtra Rail Infrastructure Development Corporation Ltd. (MRIDC) will construct Cable Stayed Bridge to replace the existing 127-year-old Bellasis Road ROB located between Mumbai Central and Grant Road Railway station. Municipal Corporation of Greater Mumbai […]
MMRC completes 28th breakthrough from CSMT to Mumbai Central
Mumbai Metro Rail Corporation (MMRC) on April 30, 2020 achieved yet another milestone with its 28th breakthrough from Chhatrapati Shivaji Maharaj Terminus to Mumbai Central. Vaitarna-2 is the first TBM to complete the stretch of […]