Search Results for SCADA system
RVNL consortium emerges lowest bidder for cabling and SCADA system for main line & depot of Mumbai Metro line 2B
Rail Vikas Nigam Limited (RVNL) emerges as lowest bidder for “Design, manufacture, supply, installation, testing and commissioning of 2 nos. 110kV receiving substation including 110 kV, 33kV & 25kV cabling work, complete 25kV overhead catenary […]
Kochi Metro Update: Tender invited for Detail Design Consultant for power supply, electrification and SCADA system for Phase-II project
Kochi Metro Rail Limited (KMRL) has invited online bids (e-Tender) under two packet systems from eligible applicants for Engagement of Detail Design Consultant (DDC) for power supply & distribution system, 750 V DC third rail […]
RVNL emerges lowest bidder for electrification and SCADA System for Surat Metro Phase-I and Ahmedabad Metro Rail Project Phase-II
Rail Vikas Nigam Limited (RVNL) emerges as lowest bidder for 2 tenders of supply, erection, testing and commissioning of power supply receiving & distribution system, 750 V DC third rail traction electrification and Scada System […]
Delhi Metro Update: Tender invited for Up-gradation of SCADA system of phase-1 & 2 of DMRC
Delhi Metro Rail Corporation Ltd.(DMRC) has invited open e-tenders from eligible applicants, who fulfil qualification criteria for Up-gradation of SCADA system from IEC 101 to IEC 104 protocols for sections of phase-1 & 2 of […]
IRCON invites tender for Design and Comissioning of IGBT based Active Power Filter system at 33 kV and SCADA system of Delhi–Ghaziabad–Meerut RRTS Corridor of NCRTC
IRCON International Limited has invited online e-Tender for Design, Detail Engineering, Supply, Testing and Commissioning of IGBT based Active Power Filter (APF) system at 33 kV Voltage level along with converter duty coupling transformers & […]
Delhi Metro Update: Tender invited for upgradation work of SCADA system of phase-I and II of DMRC
Delhi Metro Rail Corporation Ltd.(DMRC) has invited open e-tenders from eligible applicants, who fulfil qualification criteria, for the work of Up-gradation of SCADA system from IEC 101 to IEC 104 protocols for sections of phase- […]