In a significant move to enhance metro connectivity and infrastructure in Bangalore, the Bangalore Metro Rail Corporation has awarded a contract to M/s Aarvee Associates Architects Engineers & Consultants Pvt. Ltd. The contract involves preparing a feasibility study report for the extension of the metro corridors.
More Details:
The Bangalore Metro Rail Corporation Limited (BMRCL) has awarded a contract to M/s Aarvee Associates Architects Engineers & Consultants Pvt. Ltd. for the preparation of a feasibility study report. This study will explore the extension of the metro line, covering approximately 50 km across three corridors and 68 km along one corridor. The project aims to significantly enhance metro connectivity and infrastructure, addressing the city’s expanding transportation needs.
Brief about the Tender/Order:
- Tender Number: BMRCL/Metro Corridors/Feasibility Study/Consultancy/2024/103
- Name of Work: Preparation of Feasibility Study Report for extension of Bangalore Metro Rail Corridors for a length of 50.00 km (approx.) in three corridors in Package-1 and 68.00 Km (approx.) in one corridor in Package-2.
- Broad consideration or size of the order(s)/contract(s) is: Rs. 1,58,98,750/-
Scope of Work for the Contractor:
- Package-1: Preparation of Feasibility Study Report for extension of Bangalore Metro Rail Corridors for a length of 50.00 km (approx.) in three corridors viz. Challaghatta to Bidadi, Silk Institute to Harohalli & Bommasandra to Attibele.
- Package-2: Preparation of Feasibility Study Report for extension of Bangalore Metro Rail Corridors for a length of 68.00 km (approx.) in one corridor viz. Kalena Agrahara (Gottigere) – Jigani – Anekal – Attibele – Sarjapura – Varthur – Kadugodi Tree Park.
Earlier This Month Aarvee Associates Secured 2 Orders from BMRC:
The Bangalore Metro Rail Corporation Limited (BMRCL) awarded a contract to M/s Aarvee Associates Architects Engineers & Consultants Pvt. Ltd. to prepare a feasibility study report for the extension of the metro line from Madavara (BIEC) to Tumakuru, spanning approximately 52.41 km. This project aims to evaluate the potential for expanding the metro network, enhancing urban mobility, and accommodating the growing transportation needs of the region. Read Here
The Bangalore Metro Rail Corporation Limited (BMRCL) awarded a contract to M/s Aarvee Associates Architects Engineers & Consultants Pvt. Ltd. to prepare a feasibility study report for Phase-3 & 3A projects. The work includes preparation of Feasibility study report for construction as Double Decker (Flyover cum Metro) at various places, aiming to improve urban mobility and reduce congestion in the region. Read Here
Conclusion:
This initiative by BMRCL underscores its commitment to expanding urban mobility solutions and improving public transportation infrastructure. The feasibility study will play a crucial role in planning future metro extensions, ensuring efficient and sustainable transit options for Bangalore’s growing population.
Source: BMRCL – Tender Update | Image Credit (representational): BMRCL
Join us for the upcoming 5th Rail & Metro Technology Conclave with 700+ Top Rail & Metro Industry Leaders on 23rd & 24th July, 2024 in New Delhi, India. Register here and participate in the summit.