Bangalore Metro update: Bids invited for construction of 15 elevated stations for Phase-2B project

In continuation to tender for supply of Rails for Phase-2, the Bangalore Metro Rail Corporation Ltd. (BMRCL) has now invited bids for the Construction of elevated viaduct and fifteen elevated stations in three-packages for Bengaluru Metro Rail Project, Phase-2B.

  • Name of the Work: “Construction of elevated viaduct from Jyothipuram Station (Excluding) to KIA Terminals and Fifteen Elevated Stations viz., Kasturi Nagar, Horamavu, HRBR Layout, Kalyan Nagar, HBR Layout, Nagawara, Veeranna palya, Kempapura, Hebbal, Kodigehalli, Jakkur Cross, Yelahanka, Bagalur Cross, Bettahalasuru, and Doddajala, [excluding Architectural Finishing of Stations], including Road widening, Utility diversion & other allied works of Bengaluru Metro Rail Project, Phase-2B.” 
  • Venue of Tender Opening: BMRCL, 3rd Floor, BMTC Complex, Shanthinagar, Bangalore-560027
  • Date of Pre-bid Meeting: 04.08.2020 11:30:00
  • Sale End Date: 27.08.2020
  • Date and Time of Submission: From 26.08.2020 to 03.09.2020 

The three contract packages are:  

1. PHASE 2B /P1/69 (a): Construction of elevated structures (Viaduct & Stations) of length 11.003 km (including 281.00 m of Viaduct beyond Phase 2A) from Chainage 0.000 m to 10072.000 m and eight elevated metro stations viz, Kasturi Nagar, Horamavu, HRBR Layout, Kalyan Nagar, HBR Layout, Nagawara, Veerannapalya and Kempapura, including 650.00 m link line connectivity to Baiyappanahalli Depot, Road widening, Utility diversion and allied works of Bengaluru Metro Rail Project Phase-2B.

  • Estimated Cost of Work: INR 639.95 Crores 
  • Bid Security: INR 6.40 Crores 
  • Completion Period: 27 Months 

2. PHASE 2B /P2/69(b): Construction of elevated structures (Viaduct & Stations) of length 11.678 km from Chainage 10072.00 m to 21500.000 m and five elevated metro stations viz, Hebbal, Kodigehalli, Jakkur Cross, Yelahanka and Bagalur Cross, including 250 m Pocket track, Road widening, Utility diversion and allied works of Bengaluru Metro Rail Project Phase-2B.

  • Estimated Cost of Work: INR 645.30 Crores  
  • Bid Security: INR 6.45 Crores
  • Completion Period: 24 Months

3. PHASE 2B /P3/69(c): Construction of elevated structures (Viaduct & Stations) of length 15.011 km from Chainage 21500.000 m to 36511.000 m and two elevated metro stations viz, Bettahalasuru and Doddajala, including Road widening, Utility diversion and allied works of Bengaluru Metro Rail Project Phase- 2B”. This length includes approx. 718.18 m cut & cover portion in front of Yelahanka Air force station. 

  • Estimated Cost of Work: INR 620.88 Crores    
  • Bid Security: INR 6.21 Crores 
  • Completion Period: 24 Months

India (“hereinafter called “Borrower”) has applied for financing from the Asian Development Bank (ADB) toward the cost of Bengaluru Metro Rail Project, Phase 2A & 2B. Part of this financing will be used for payments under the Contracts named above. Bidding is open to Bidders from eligible source countries of ADB.  

Contact person and Place for (a) Pre bid Meeting, (b) Seeking clarifications & Submission of bid:

General Manager (Contracts), Bangalore Metro Rail Corporation Ltd., 3rd Floor, BMTC Complex, K.H. Road, Shantinagar, Bengaluru-.560027, Karnataka, India.

  • Tel: +91-80-22969300/301
  • Fax: +91-80-22969222
  • Email: contracts@bmrc.co.in 
  • Web site: www.bmrc.co.in

To purchase the Bidding documents, eligible bidders should visit the web site www.bmrc.co.in . Bidders can download Bid document against online payment for INR 56,000/- inclusive of GST, from BMRCL website www.bmrc.co.in from 14 July 2020 until midnight of 27 August 2020.


Source: BMRCL-Tender | Image Credit (Map): ADB