Bangalore Metro Rail Corporation Ltd., (BMRCL) invites open Bid from eligible, reputed and experienced Consultants (JV/Consortium Not Permitted) for Maintenance contract for artificer works (Petty Repairs) at Sampige Road (SPGD), Srirampura (SPRU), Kuvempu Road (KVPR), Rajaji Nagar (RJNR), Mahalakshmi (MHLI), Sandal Soap Factory (SSFY) and Yeshwanthpura (YPM) metro stations in reach 3 of line-2.

  • Tender Reference Number: BMRCL/O&M/CSW/L2/04/2022-23
  • Name of Work: Maintenance contract for artificer works (Petty Repairs) at Sampige Road (SPGD), Srirampura (SPRU), Kuvempu Road (KVPR), Rajaji Nagar (RJNR), Mahalakshmi (MHLI), Sandal Soap Factory (SSFY) and Yeshwanthpura (YPM) metro stations in reach 3 of line-2.
  • Estimated Cost: INR 1,24,79,248 Crore
  • EMD: INR 02 Lakh
  • Completion Period: 12 Months
  • Document Download / Sale Start Date: 14th October, 2022
  • Document Download / Sale End Date: 08th November, 2022
  • Pre-bid Meeting: 05th November, 2022
  • Bid Submission Start Date: 14th October, 2022
  • Bid Submission End Date: 14th November, 2022
  • Tender Opening Date: 14th November, 2022

Eligibility:

  • Eligible Tenderers Tenderers shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by the Government of Karnataka or BMRCL.
  • This is a Domestic Competitive Bidding. Sole Proprietorship Firm/ Partnership Firm/Private Limited Company/ Public Limited Company are eligible to apply Any bidder from a country which shares a land border with India will be eligible to bid in this tender only if the bidder is registered with the Competent Authority.
  • The Competent Authority for registration will be the Registration Committee constituted by the Department for Promotion of Industry and Internal trade (DPIIT).
  • For Details refer to Order (Public Procurement No.1, F.No.6/18/2019-PPD) dated 23/07/2020 issued by the Ministry of Finance, Department of Expenditure, Public Procurement Division.
  • This clause will not apply to bidders from those countries (even if sharing a land border with India) to which the Government of India has extended lines of credit or in which the Government of India is engaged in development projects.
  • All the participating tenderers are mandatorily required to submit a certificate along with the tender regarding their compliance with this clause/order in regard to restrictions of procurement from the bidders from countries sharing land borders with India as per the format included in Annexure-7 to these Contract Conditions.
  • If such certificate given by a bidder whose bid is accepted is found to be false, this would be a ground for Immediate termination and further legal action in accordance with law.

Tenders from Joint ventures are not acceptable:

  • The Tenderer should not have been blacklisted / debarred by any Government / Government undertaking / semi Government / Govt. Controlled Institutions/projects/ Reputed private organizations in India during the last five (5) years.
  • Also the Tenderer should not have rescinded the works after award of the contract during the last five (5) years. The Tenderer shall provide an Undertaking as provided at Annexure — 4 of Section-10.

Work Experience:

  • The Tenderer should have executed the works / have experience in ‘similar works’ in any of the following organisations during last five (5) years:
    • In any Central Govt. / State Govt./PSU’s / Govt bodies / MES/Railway/CPWD/KPWD / Metro Rail Corporation Limited. or
    • In any Private Limited Companies/Public Limited Companies / IT Buildings / Parks, Commercials Complexes/ Special Economic Zones/ Industrials complexes etc.
  • All Tenderers shall provide the requested Information accurately and in sufficient detail in Section 3: Qualification Information.

To qualify for award of this Contract:

  • Each Tenderer in its name should have in the last five financial years i.e. 2017-18, 2018-19, 2019-20,2020-21 & 2021-22 achieved in at least two financial years a minimum annual financial turnover of Rs 249.58 Lakhs, or
  • Each Tenderer in its name should have successfully completed or substantially completed similar works during last five (05) years either of the following:
    • One similar work costing not less than the amount equal to Rs. 82.40 Lakhs, or
    • Two similar works costing not less than the amount equal to Rs. 49.92 Lakhs, or
    • Three similar works costing not less than the amount equal to Rs. 37.44 Lakhs.

Recent Tenders:

  • Tender Reference Number: BMRCL/Phase-2A and 2B/Track Work/2022/93
    • Name of Work: Design, supply, installation, testing and commissioning of ballasted / ballastless track of standard gauge in Phase-2A and 2B and in Baiyappanahalli and Airport Depots for Bangalore Metro project.
    • Estimated Cost: INR 267.48 Crore-Package-1, 232.68 Crore-Package-2
    • EMD: INR 2.67 Crore-Package-1, 2.32 Crore-Package-2
    • Completion Period: 36 Months-Package-1, 36 Months-Package-2
    • Document Download / Sale Start Date: 03rd October, 2022
    • Document Download / Sale End Date: 14th November, 2022
    • Pre-bid Meeting: 21st October, 2022
    • Bid Submission Start Date: 03rd October, 2022
    • Bid Submission End Date: 15th November, 2022
    • Tender Opening Date: 15th November, 2022
  • Tender Reference Number: BMRCL/ELE/378/2022
    • Name of Work: Design, fabrication, supply and installation of Signage & Graphics for 16 stations of Reach-5 of Phase-2.
    • Estimated Cost: INR 8,84,47,962 Crore
    • EMD: INR 13,26,720 Lakh
    • Completion Period: 06 Months
    • Document Download / Sale Start Date: 07th October, 2022
    • Document Download / Sale End Date: 02nd November, 2022
    • Pre-bid Meeting: 19th October, 2022
    • Bid Submission Start Date: 07th October, 2022
    • Bid Submission End Date: 09th November, 2022
    • Tender Opening Date: 09th November, 2022

About BMRCL:

  • Bangalore Metro Rail Corporation Limited (BMRCL), a joint venture of Government of India and Government of Karnataka, is a Special Purpose Vehicle entrusted with the responsibility of implementation and operation of Bangalore Metro Rail Project.
  • Bangalore Metro, christened as “Namma Metro”, not only adds to the beauty of Bangalore city skyline, but more importantly provides a safe, quick, reliable and comfortable public transport system. Besides this, Namma Metro is a major environment friendly addition to the Bangalore City as it significantly contributes to the reduction of carbon emissions.
  • Metro services have been in operation on 56 KM on East-West corridor – 25.6 km long, starting from Baiyappanahalli in the East and terminating at Kengeri Terminal in the West and on 30.4 km North-South corridor commencing at Nagasandra in the North and terminating at Silk Institute in the South.
  • This is the First Metro rail project in India commissioned with 750V DC Third Rail Traction on Standard Gauge.

The complete documents can be downloaded from www.bmrc.co.in


Source: BMRCL- Tender | mage Credit (representational): BMRCL