Delhi Metro Rail Corporation Ltd. has invited Open e-tender through e-tendering system (i.e. Technical and Financial bid) for Contract: OTW-936 – “Supply and Installation of Smart Solutions equipment in DMRA.
Key Details:
- Name of Work: Contract: OTW-936: “Supply and Installation of Smart Solutions equipment in DMRA”.
- Approximate Cost of work: Rs. 549.47 Lakhs
- Completion Period: 06 Months for SITC, 60 months for CAMC after 24 months of DLP
- Pre-bid Meeting: 22.06.201 at 11:30 Hrs.
- Tender submission Start Date and Time (online): 06.07.2021 (from 14:00 Hrs.)
- Tender submission end Date and Time (online): 12.07.2021 (up to 14:00 Hrs.)
- Date & Time of opening of Tender (Technical Bid) (online): 13.07.2021 at 14:30 Hrs.
Other Recent Tender:
Meanwhile, DMRC has invited online open e-tenders for the design, execution and completion of “Contract DC-05: Design & Construction of Twin Tunnel by shield TBM, Tunnel by Cut & Cover, Underground ramp at Derawal Nagar and 6 underground stations viz. Derawal Nagar, Ghanta Ghar, Pulbangash, Sadar Bazar, Nabi Karim & Ramakrishna Ashram Marg Including Architectural Finishing, Water supply, Sanitary installation, Drainage works of stations on Janakpuri West to R.K. Ashram Corridor (Line-8 Ext.) of Phase-IV of Delhi MRTS.
Key Details:
- Tender Number: DC-05
- Period Of Work: 42 months
- Sale of Bidding documents: From 10.06.2021to 28.07.2021
- Pre Bid Meeting Date: 26-Jun-2021 11:00 AM
- Bid Submission Start Date: 21-Jul-2021 09:00 AM
- Bid Submission End Date: 28-Jul-2021 03:00 PM
- Bid Opening Date: 29-Jul-2021 03:00 PM
Funds:
- The President of India has received a loan for an amount of JPY 119,978 Million from Japan International Cooperation Agency (JICA) towards the cost of Delhi Mass Rapid Transit System Project (Phase 4).
- It is intended that part of the proceeds of this loan will be applied to eligible payments under the Contract DC-05.
About The Project:
Delhi MRTS Project Phase-IV (Priority Corridors) consists of following Corridors:
Corridors | Elevated | Underground | Total | |||
Length (Km) | Station | Length (Km) | Station | Length (Km) | Station | |
Mukundpur-Maujpur (Extension of Line-7) | 12.558 | 8 | 0 | 0 | 12.558 | 8 |
Janakpuri (W)-R.K.Ashram (Extension of Line-8) | 21.180 | 14 | 7.740 | 7 | 28.92 | 22 |
Aerocity-Tughlakabad Line-10 | 4.279 | 4 | 19.343 | 11 | 23.622 | 15 |
Total | 38.017 | 26 | 27.083 | 18 | 65.100 | 45 |
Tentative Commissioning Targets of the Corridors:
S.No. | Corridors | Completion Target |
1 | Mukundpur – Maujpur | December, 2022 |
2 | Janakpuri(W) – R.K.Ashram | June, 2024 |
3 | Aerocity – Tughlakabad | March, 2025 |
Tender document can only be obtained after registration of tenderer on the website https://eprocure.gov.in/eprocure/app .
Source: DMRC-Tender | Image Credit (representational): DMRC
Be the first to comment