DFCCIL invites tender for Road Over Bridge (ROB) Railway Portion between DDU to PRYJ Station

Dedicated Freight Corridor Corporation of India Limited (DFCCIL) has invited e-tenders on two packet system on prescribed forms from firms/Companies/Joint Ventures having requisite experience and financial capacity for execution of the following work:

  • Tender Notice No.: PRYJ/EN/DDU-PRYJ/ROB-12&31/2021/02
  • Name of Work: Construction of Two-Lane Road Over Bridge (ROB) Railway portion at level crossings No. 12 (36m+36m) IR KM 755/19-21 & level crossing no. 31 (36m+36m+18m) IR Km 807/23-25 Railway Portion between DDU to PRYJ Station Prayagraj Division of North Central Railway.
  • Estimated Cost: Rs.34,49,94,523/-
  • Period of completion: 12 months
  • Pre Bid Meeting: 09.11.2021
  • Date of Opening of Tender: 02.12.2021

 Scope of work:

Construction of Two-Lane Road Over Bridge (ROB) Railway portion at level crossings No.  12 (36m+36m) IR KM 755/19-21 & level crossing no. 31 (36m+36m+18m) IR Km 807/23-25 Railway Portion between DDU to PRYJ Station Prayagraj Division of North Central Railway

The scope of work shall include but not limited to:

  • Construction of RCC piers for 4×36m & 1×18m Composite Girder with pile foundation.
  • Supply, Fabrication, Erection and Launching of Composite Girders (4×36m &  1×18m) as mentioned in GAD (with or without power and traffic power blocks, as applicable)
  • Providing and fixing in position standard rocker/roller type and fixed type POT  bearing, free sliding type POT cum PTFE bearing and Elastomeric bearing, as per approved drawings including designs of bearings.
  • Preparation of Quality Assurance  Plan (QAP) for fabrication of superstructure,  preparation of Temporary Arrangement Drawings (TAD), Launching Scheme,   Fabrication/Detail Shop Drawings including DODLs and execution as per this  QAP/Drawings and preparation of documentation for processing CRS Sanction.
  • Preparation of Quality Assurance Plan (QAP) for sub-structure, foundation,  super-structure including bearings and ensuring the execution as per this QAP.
  • Preparation of Quality Assurance Plan (QAP) for earthwork, blanket and concrete works and ensuring the execution as per this QAP.
  • Construction of minor bridges/culvert as required. 
  • Construction of RCC Wall along the track for closing of existing LCs, drain all works related to constructing of ROB over DFCCIL and Railway.
  • Temporary Works: Making any temporary work to facilitate construction and for the  purpose of arranging any temporary land for the working or stacking of materials of contractor at no extra cost.
  • Incidental Works: Safety, Health & Environment (SHE) compliances, Quality  Assurance, Interface Management with other contractor, Restoration of existing  roads and services other than being relocated / dislocated on account of DFC alignment during construction, management of road traffic around the worksite at no extra cost.
  • Obtaining relevant certificates of clearance from local/civil authorities viz. permits,  licenses, completion certificate, fire clearance or any other mandatory clearances which may be specified by these authorities from time to time. 
  • Obtaining permission for Works with or without traffic block from concerned Railway authority/interfacing agencies for work in close vicinity of Indian Railway  track, wherever applicable and DFCC shall assist in obtaining such permits.
  • Benchmarking, setting out, photography, videography, permanent markers like land boundary pillars, signages, boards etc. As-Built drawings, inspection books,  registers for record & maintenance of bridges/ alignment etc.
  • Submission of periodical progress reports with site photos and videos, attending  progress review meetings with employer/concerned authorities (o) Other miscellaneous works as listed in Schedules / GCC/ SCC.

Note: 

The scope of work is only indicative and as per requirement, bridges, pathways, earthwork may be added in the scope of work or location may change. The span arrangement of the bridges/viaduct is also indicative which may increase/decrease as per final approved drawing.

About Eastern Dedicated Freight Corridor:

  • Eastern DFC Route will be approximately 1839 Km long from Dankuni to Ludhiana via Dankuni – Asansole – Dhanbad – Gaya – Sonnagar – Mughalsarai – Allahabad – Kanpur – Tundla – Aligarh – Khurja – Bulandshahr – Meerut – Saharanpur – Ambala – Ludhiana.   
  • Proposed alignment of DFC has been generally kept parallel to existing Indian  Railway lines except provision of detours at some stations where the existing yards/cities are congested.
  • Construction of Two-Lane Road Over Bridge (ROB) Railway portion at level crossings No. 12 (36m+36m) IR KM 755/19-21 & level crossing no. 31 (36m+36m+18m) IR Km 807/23-25 Railway Portion between DDU to PRYJ Station Prayagraj Division of North Central Railway.

Tender document will be available on DFCCIL’s website www.dfccil.com, www.ireps.gov.in & Central Procurement portal https://eprocure.gov.in/cppp/


Source: DFCCIL-Tender | Image Credit (representational): IRCEP