Indore Metro update: Tenders invited for construction of 7 elevated Metro Stations

The Madhya Pradesh Metro Rail Corporation Limited (“MPMRCL”- “the Employer”) has invited online open e-tenders from eligible applicants of all countries, for the Tender Package IN02: “Design and Construction of Seven (7) Elevated Metro Rail Stations including Viaduct portion within the stations and Transition spans on either side of the stations (ISBT/MR10 Flyover, Chandragupta Square, Hira Nagar, Bapat Square, Meghdoot Garden, Vijay Nagar Square & Radisson Square)” for Indore Metro Rail Project. 

  • Tender Notification No.: 200/MPMRCL/2021/Package IN-02
  • Name of Work: “Design and Construction of Seven (7) Elevated Metro Rail Stations including Viaduct portion within the stations and Transition spans on either side of the stations, Entry-Exit Structures, Architectural Finishes, E&M Works etc. (ISBT/MR10 Flyover, Chandragupta Square, Hira Nagar, Bapat Square, Meghdoot Garden, Vijay Nagar Square & Radisson Square)” of Indore Metro Rail Project. 
  • Approx. cost of work: INR 369 Crores 
  • Completion Period: 847 Days 
  • Pre Bid Meeting Date: 19-Mar-2021
  • Document Download / Sale Start Date: 27-Feb-2021
  • Document Download / Sale End Date: 19-Feb-2021
  • Bid Submission Start Date: 09-Apr-2021
  • Bid Submission End Date: 19-Apr-2021
  • Bid Opening Date: 20-Apr-2021

Source of Funds: 

E-Tenders are invited from reputed and experienced contractors for following Works. Tenderers may download the tender documents from the official e-tender portal. The Employer has applied loans from the various multi-lateral funding agencies towards the part cost of the Project, and the balance cost through equity contribution of Government of India (GoI) and Government of Madhya Pradesh (GoMP). This tender package is proposed to be funded through equity contribution of GoI & GoMP

Scope of Work:

Brief Scope of Work:

  • This scope of work is to be read in conjunction with the Employer’s Requirements set out in all the Tender Volumes.
  • 18.1.2 Design and Construction of all Civil, Structural, Roof Structure, Mechanical, Electrical and Plumbing (MEP) works, Architectural finishes and Façade for 7 Elevated Metro Rail Stations including Entry/Exit, Foot Over Bridge (FOB), Viaduct within Station, Transition spans and provision for Solar Panel Installation.
  • The Seven (7) Elevated Metro Rail Stations are, ISBT/MR 10 Flyover, Chandragupta Square, Hira Nagar, Bapat Square, Meghdoot Garden, Vijay Nagar Square & Radisson Square for Indore Metro Rail Project.
  • Station names are tentative and are likely to undergo change as per the approval of GoMP.

More Details:

  • The design and construction of the Works shall be developaed in accordance with the Employer’s Requirements and the Contractor’s Technical Proposals.
  • The Works shall be designed for minimal maintenance through a 100-year operational life.
  • The Contractor shall provide all the software confirmed in the Employer’s requirements in a timely manner to permit the Engineer to review the Contractor’s submissions.
  • All the works in this Contract are covered under Schedule ‘A’, Schedule ‘B’ and Schedule ‘C’.
  • The Schedule ‘A’ shall include Design and Construction of Metro Station including all Civil, Structural, Roof Structure, MEP works, Entry/Exit, FOB, viaduct within station, Transition spans, corridors, ancillary building i.e. underground/surface water tank, pump room and DG room, lift shafts, escalator pits, staircases and provision for Solar Panel installation for all 7 Stations.
  • The Schedule ‘B’ shall include Design and Execution of roof sheeting and all Architectural works in public and non-public areas which includes Concourse, Platform, Foot over Bridge (FOB), Entry/Exit structure, Ancillary structures, Water Storage Tanks, pump rooms, DG Set, Pick-Up and Drop off bays for other modes of transport, foot path, Plaza area, system rooms; construction of masonry/blockwork walls, mullions, tie beams, Lintels, Plastering, Painting & cladding, flooring & ceiling etc, complete as approved by the Employer/Engineer.
  • The Schedule ‘C’ shall include Design and Execution of Façade works including the required supporting structural elements as approved by the Employer/Engineer.
  • The Schedule ‘A’ shall include Design and Construction of all Civil, Structural  including roof, MEP works, Entry/Exit, FOB, viaduct within station, Transition spans corridors, ancillary building i.e. underground/surface water tank, pump room and DG room, lift shafts, escalator pits, staircases and provision for Solar Panel installation as detailed in the Employer’s Requirements, including but not limited to:
    • Progressive Design Assurance (including Design Workshops and Design Gate Review with the Engineer and Project Partners).
    • All site survey and setting out work.
    • Site clearance and establishment of the site boundary.
    • Offices for the Employer/Engineer, and the continuing maintenance and attendance.
    • Casting yard and materials laboratory.
    • Location of underground utilities through trial trench investigation at all pier/column and foundation locations.
    • Utility retention/protection.
    • Geotechnical investigation at all piers/columns of Viaduct/guideway and stations foundation locations.
    • Ground treatment as and where required.
    • Viaduct and station foundations, substructure, superstructure and platform roof.
    • Viaduct and station drainage requirements.
    • Shear connectors for track plinth and crossovers.
    • Station entrances, Subways and Foot Over Bridge (FOB) structures;
    • Multimodal commuter facilities at Entry/Exit Plaza level, Bus bays, pick-up/dropoff bays, street furniture (benches etc.,) kerb inlet, parking etc.
    • MEP services including drainage, water supply, sewage disposal, lighting (temporary and permanent), auxiliary power, Fire Life Services and spare parts etc.

Source: MPMRCL-Tender | Image Credit (representational): MPMRCL