IRCON invites bids for civil works up to formation for double line railway for Vaitarana-Sachin Section of Western Dedicated Freight Corridor Phase-2

IRCON International Limited has invited online bids in Limited Tender (Single Packet) on prescribed forms from bonafide firms/companies having requisite experience and financial capacity for execution of the work given below. 

  • Tender Reference Number: IRCON/3018/DFCCTP12/e Tender/Infra Work/SS1AII/401
  • Name of Work: Construction of civil works up to formation for double line railway involving formation in Embankments/ Cuttings, blanketing, minor bridges, Major Bridges and RUB’s (excluding those already awarded to other contractors) retaining walls, drains, ground improvement works, relocation of existing roads, Construction of new roads, etc., from DFC Ch. 103+980 to 112+000 in connection with construction of Western Dedicated Freight Corridor, Phase-II (Vaitarana-Sachin Section) for sub packages SS1 A-II in Maharashtra state.
  • Estimated Cost: INR 44.41 Crore
  • Completion Period: 04 Months
  • Document Download / Sale Start Date: 08-Oct-2021
  • Document Download / Sale End Date: 15-Oct-2021
  • Bid Submission Start Date: 10-Oct-2021
  • Bid Submission End Date: 15-Oct-2021
  • Bid Opening Date: 16-Oct-2021

Scope of Work: 

The scope of present tender for the work is as “Construction of civil works up to formation for double line railway involving formation in Embankments/ Cuttings, blanketing, minor bridges, Major Bridges and RUB’s (excluding those already awarded to other contractors) retaining walls, drains, ground improvement works, relocation of existing roads, Construction of new roads, etc., from DFC Ch. 103+980 to 112+000 in connection with construction of Western Dedicated Freight Corridor, Phase-II (Vaitarana – Sachin Section) for sub packages SS1 A-II in Maharashtra state”.

As detailed below but not limited to:

  • True and proper setting out and layout of the works, providing location marks, benchmarks etc.as per (XYZ) coordinates system adopted by Client, preparation of report and plans.
  • Relocation of utilities & Removal of existing structures. e.g. Duty Huts/Gates Lodges & existing structures as identified within the ROW.
  • Retaining Walls.
  • Ground improvement, Slope Stability work.
  • Drainage work, Safety wall.
  • Construction of Minor bridges /box culverts, Underpasses/RUB, Major Bridges etc.
  • Construction of Embankment/Cutting including clearing & grubbing, stripping of Soil, Earthwork in filling (with suitable soil from approved borrow area & cut spoil)/Cutting disposal of unsuitable earth with construction of drainage.
  • Construction of Granular Sub-grade and Blanketing.
  • Road works.

Others – General:

  • All aspects of quality control and quality assurance of Works including documentation.
  • Providing measures for prevention / mitigation of environmental impacts due to construction activities.
  • All works to be executed complying to SHE( Safety Health & Environment) Requirements as mentioned in client’s Agreement with employer.
  • Provision of laboratory for testing, including the supply of technical personnel, equipment, instruments and consumables etc.
  • Handing over of the works on completion after due site clearance to engineer/ employer.
  • Submission of data for As built drawings and other related documents
  • Rectification of the defects in the completed works during the defect liability period.
  • Execution of any other item of work for the construction and completion of the Works in accordance with the provisions of Contract including all incidental items as well as preparation and submittal of reports, plans as required.
  • During the period of the contract the right of way and all existing roads shall be kept open for traffic for a safe and usable condition. Traffic control and traffic diversions shall be provided as necessary to protect the works and maintenance will be carried out as directed by the Client Representative and provided in the contract.
  • Any other item of work as may be required for completing the scope of works including all incidental works in all respects in accordance with the provisions of the contract.

The scope given above is only indicative. The detailed scope has been described in the tender documents.

Website https://etenders.gov.in/eprocure/app may be referred for detailed terms and conditions of the bidding documents, which is available online.

Recent Tender:

IRCON International Limited has invited online bids in ‘Single Packet-Limited Tender’ on prescribed forms from bonafide firms/companies having requisite experience and financial capacity for execution of the work given below.

  • Tender Reference Number: IRCON/3018/DFCCIL-CTP12/ eTender/SS2BIV/08-401
    • Name of Work: Balance work of “Construction of bridges (Major, Minor and RUBs) from DFC Ch: 151.000 to DFC Ch:162.900 in connection with construction of Western Dedicated Freight Corridor phase-Il Vaitarana – Sachin section”: Package – SS2B-IV (Bridge Work).
    • Estimated Cost: INR 19.67 Crore
    • Completion Period: 4 Months
    • Document Download / Sale Start Date: 06-Oct-2021
    • Document Download / Sale End Date: 13-Oct-2021
    • Bid Submission Start Date: 07-Oct-2021
    • Bid Submission End Date: 13-Oct-2021
    • Bid Opening Date: 14-Oct-2021

Source: IRCON-Tender | Image Credit (representational): Alstom