IRCON invites bids for providing and making Gabion structure for Sivok-Rangpo new BG Railway Line Project

IRCON International Limited on behalf of Northeast Frontier Railways (NFR) has invited online bids in open tender one packet system on prescribed forms from bonafide firms/companies having requisite experience and financial capacity for execution of the work detailed in the given below. 

  • Tender Reference Number: IRCON/2046/NFR-SRRP/PROTECTION WORK/W CRATES/250
  • Name of work: Providing and making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes in Dumping area at DI Fund Land at Sivok in connection with construction of Sivok-Rangpo new BG Railway Line Project.
  • Estimated Cost of Work: INR 1,42,70,192/-
  • EMD: INR 2,50,000/-
  • Completion Period: 06 Months
  • Document Download / Sale Start Date: 13th Feb, 2023
  • Document Download / Sale End Date: 06th Mar, 2023
  • Bid Submission Start Date: 01st Mar, 2023
  • Bid Submission End Date: 06th Mar, 2023
  • Bid Opening Date: 07th Mar, 2023

Scope of Work:

The scope of work for “Providing and making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes in Dumping area at DI Fund Land at Sivok in connection with construction of Sivok-Rangpo new BG Railway Line Project”and all other ancillary work as per approved drawing generally includes following but not limited to following

  • The Survey work shall involve taking over of sight, contouring of DI Fund land and nearby area, with centre line pegs, checking and verification of bench marks and protection of the same, taking & recording cross sections of natural ground levels.
  • Removing of stumps and roots and disposal as instructed. Clearing the site by removing vegetation encountered during earthwork between toe of bank and top of cutting and disposal as instructed.
  • Excavating and disposing of all types of soils, rocks and conglomerate from work place as directed by the ENGINEER. The Contractor/s has/have to make his/their own arrangements for dumping the excavated material. The dumping sites shall be indicated by IRCON. 
  • However, in case IRCON is unable to do so, the Contractor shall arrange the land. The cost accrued on this account shall be paid as per the actual expenditure made by the Contractor. (as per NEERI guidelines)
  • The contract envisages all permanent and temporary works, which are necessary for the efficient execution and completion of work.
  • The information and data stated herein and incorporated in contract elsewhere is for the general guidance only and may vary as a result of more detailed site investigation and construction drawings.
  • Any other ancillary works required to complete the protection work as approved by the ENGINEER and as per approved drawings.
  • All safety arrangements as per relevant IS, IRC and IRS Codes of practice and as specified intender documents.
  • Lighting during construction at night time, pumping/dewatering of water.
  • Provision of all drainage and service pipe as per approved drawings.
  • Maintenance of all works for specified period.
  • The contractor shall carry out the work safely and no unsafe practices shall be followed. The tenderer is expected to take into account these factors while quoting the rates.
  • All Works to be done as per relevant and approved drawings, specifications and code.
  • All necessary arrangements as per Safety, Health and Environment management plan and instructions and as specified in the tender documents.
  • The work is to be done in a smooth coordinated manner without hindrance to the work of other agencies, local populace and surroundings and as per the instruction of Engineer-in-charge.
  • No claim for any stoppage of work by local populace for issues related to compensation, employment or any other shall be entertained.
  • The work shall be done as per the instructions of IRCON/DDC.
  • The contractor shall be responsible for the arrangements to obtain water supply for drinking and construction works. Rates quoted by the contractor shall include the cost of arranging water at the site.
  • Any electric supply required at the site for works or for whatsoever purpose shall be arranged by the contractor at his own cost.

The complete Bid Document can be viewed / downloaded from the e-Procurement portal i.e. https://etenders.gov.in/eprocure/app free of cost.


Source: IRCON-Tender | Image Credit (representational): NFR