IRCON invites bids for providing consultancy services for progress Monitoring for Gevra-Pendra New BG electrified Railway line

IRCON International Limited, for and on behalf of Chhattisgarh East West Railway Limited (CEWRL), has invited online bids for Providing consultancy services for progress Monitoring and presenting through Primavera EPPM based progress scheduler and providing a cloud- based for document controlling and storage for New BG Electrified Double Railway line over South East Central Railway between Gevra (Km 0) to Pendra (Km 135) in the State of Chhattisgarh.

Key Details:

  • Tender No: IRCON/2060/CGRP/e-TENDER/21-22/GEVRA-PENDRA/BSP-48
  • Estimated Cost of Work: Rs. 29.73 lakhs
  • Completion Period: 24 months
  • Bid Submission Start Date: 08.07.2021
  • Bid Submission End Date: 14.07.2021
  • Bid Opening Date: 15.07.2021

General Information:

  • The project execution agreement (PEA) has been signed between CEWRL & IRCON is executing the construction works of new BG Electrified Double Railway line for East West Rail Corridor between Gevra Road to Pendra Road via Dipka, Katghora, Sendurgarh, Pasan with approximate length 135Km. East West Corridor also includes single line between Urga to Kusmunda of 11.51 Km and connectivity of Approximate 35 Km length.
  • IRCON intends to engage an experienced and resourceful agency who can carry out Providing consultancy services for progress Monitoring and presenting through Primavera EPPM based progress scheduler and providing a cloud- based for document controlling and storage for New BG Electrified Double Railway line over South East Central Railway between Gevra (Km 0) to Pendra (Km 135) in the State of Chhattisgarh.

Scope of work:

The scope of work is broadly described as “Providing consultancy services for progress Monitoring and presenting through Primavera EPPM based progress scheduler and providing a cloud- based for document controlling and storage for New BG Electrified Double Railway line over South East Central Railway between Gevra (Km 0) to Pendra (Km 135) in the State of Chhattisgarh”.

Scope of works is as indicated below but not limited to:

  • Preparation of scheduling, monitoring and updating of Master schedule in PRIMAVERA P6 EPPM up to L4/L5/L6 for the project implementation on a daily basis, based on the define of respective procurement activities at owner’s end as well as supply of equipment and site execution based on contract.
  • Time to time intimation to the owner regarding the status of the project progress on the timeline covering all afore-mentioned aspects.
  • Incorporate and intimate, the input received from the concerned agencies on agreed frequency in master control schedule.
  • Deviations from the schedules shall be monitored and controlled. Based on the priorities of deviation escalation shall be controlled.
  • Compliance report and advance warnings shall be ensured and intimated to us on priority basis.
  • Based on priority tasks, management interventions shall be ensured.
  • Preparation of Weekly Progress Report, Monthly progress report etc., along with probable anticipated schedule ahead of 60 days to 120days.
  • Reporting shall be monitored by periodic meetings as decided by the management.
  • Resource addition in the approved plan and predetermining variability of resources in the look ahead schedule using what-if analysis.
  • Provide a cloud-based platform for document storage and controlling.
  • Providing status of Project’s schedule on the timeline.
  • Update schedule on weekly basis.
  • Concurrent delay analysis of the schedule impacting deviation of works under obligations of separate stakeholders.
  • Earned value analysis of the project for cash flow management.
  • Find out deviations in schedules. Decide priorities of deviations to escalate to various levels.
  • Preparation of recovery plan against Baseline schedule.
  • Working of requirement of resources & Resource Analysis.
  • Ensure priority compliance and advance warnings
  • Ensure management intervention on priority tasks.
  • Preparation of daily reports, participate in daily meeting, prepare action point.
  • Preparation of weekly reports, Look Ahead schedule and/or presentations.
  • Reporting shall be by periodic management meetings.

The complete Bid Document can be viewed / downloaded from the e-Procurement portal i.e. https://etenders.gov.in/eprocure/app 


Source: Ircon-Tender | Image Credit (representational): MoR