The Kanpur Metro Rail project has achieved a crucial step in its underground section with the completion of the ‘up-line’ tunnel from Swadeshi Cotton Mill to Transport Nagar station. Tunnel Boring Machine (TBM) ‘Azad’ successfully broke through after constructing a 330-meter-long tunnel in this stretch, marking another accomplishment for the city’s expanding metro infrastructure.
Next Step:
TBM ‘Azad’ will now proceed towards Kanpur Central via Jhakarkati station. This breakthrough paves the way for further tunnelling towards key stations, including Kanpur Central and Jhakarkati. The project continues to progress in alignment with its deadlines, ensuring better connectivity for the residents of Kanpur. The up-line tunnel’s completion will facilitate smooth metro operations once the entire underground stretch is fully constructed and integrated into the network.
Some Recent Updates of Kanpur Metro:
In Oct: A major milestone for Kanpur Metro’s expansion was achieved, the tunnel construction for Corridor-2 was officially launched under the presence of UPMRC Managing Director Shri Sushil Kumar. The fifth Tunnel Boring Machine (TBM) has been deployed to commence tunnelling in the 4.10 km underground stretch from Rawatpur to Double Pulia. This move accelerates the development of key areas along this metro line. Read Here
In Oct: The first test run of the metro train was successfully conducted on the ‘down line’ of Kanpur Metro’s Chunniganj-Nayaganj underground section. Starting from Motijheel, the train reached Nayaganj, passing through key stations, as locals enthusiastically welcomed the metro. This marks a major step forward in completing the 15 km route from IIT to Nayaganj. Read Here
In Sep: All platforms for stations along the 5 km Baradevi-Naubasta elevated section of the Kanpur Metro were completed. Construction of the roof and technical rooms is advancing steadily. MD Shri Sushil Kumar conducted a review of the ongoing construction to assess the progress. Read Here
Conclusion:
The successful breakthrough by TBM ‘Azad’ marks a significant advancement in Kanpur Metro’s tunnelling works. As the metro extends towards Kanpur Central, the project remains on track, offering hope for improved urban mobility and reduced congestion. The upcoming phases of construction will be vital for the city’s growing transportation needs.
Source: UPMRC | Images Credit: UPMRC