Mumbai Metropolitan Region Development Authority (MMRDA) has invited Request for Proposal (RFP) from eligible bidders through MMRDA e-tendering Portal for GC-07A Appointment of General Consultant for Civil and System works of Mumbai Metro Line 10 (Gaimukh – Shivaji Chowk (Mira Road) and Mumbai Metro Line 12 (Kalyan- Taloja) of Mumbai Metro Rail Project of MMRDA, Mumbai.
- Tender Ref No: MMRDA/Metro- PIU/0002704
- Name of Work: GC-07A Appointment of General Consultant for Civil and System works of Mumbai Metro Line 10 (Gaimukh – Shivaji Chowk (Mira Road) and Mumbai Metro Line 12 (Kalyan – Taloja) of Mumbai Metro Rail Project of MMRDA, Mumbai.
- Contract Period: 54 Months
- Tender Document Download Start Date: 15/02/2022
- Tender Document Download End Date: 25/03/2022
- Pre-Bid Meeting: 28.02.2022
- Last Date of Submission: 31.03.2022
Tender Schedule:
Sr No. | Department Schedule | Supplier Activity: | Duration | Start Date and Time | End Date and Time |
1 | Tender Authorization and Publishing | 0 Days 35 Minutes | 15/02/2022 | 15/02/2022 | |
2 | Tender Document Download | 38 Days 2 Hours 29 Minutes | 15/02/2022 | 25/03/2022 | |
3 | Bid Preparation and Submission | 44 Days 2 Hours 29 Minutes | 15/02/2022 | 31/03/2022 | |
4 | Tender Closing | 0 Days 29 Minutes |
31/03/2022 | 31/03/2022 | |
5 | Online Control Transfer of Bid | 0 Days 23 Hours 29 Minutes | 31/03/2022 | 01/04/2022 | |
6 | Opening Envelope A – Tender Fees, EMD | 0 Days 7 Hours | 04/04/2022 | 04/04/2022 | |
7 | Opening Envelope B – Technical Bid | 0 Days 7 Hours |
04/04/2022 | 04/04/2022 | |
8 | Opening Envelope C – Financial Bid | 0 Days 7 Hours 04/04/2022 11:00 AM | 04/04/2022 | 04/04/2022 | |
9 | Tender Award |
About Metro Line 12 and 10:
- The Mumbai Metro Rail Project i.e. Line 12 from Kalyan to Taloja (Extension of Line 5 metro project) is proposed to be constructed at an estimated cost of Rs.4738.00 Crore with all taxes and land cost.
- The total length of the line is planned to be 20.756 kilometres (12.89 mi)..
- The Mumbai Metro Line 10 Project i.e. from Gaimukh to Shivaji Chowk (Mira Road) is proposed to be constructed at an estimated cost of Rs.3821.00 Crore with all taxes and land cost.
- Length of this corridor is 9.209 km, having 4 stations.
Tenderers are requested to note that tender is being invited through e-procurement. Tender documents can be obtained online from MMRDA e-Tendering Portal: https://etendermmrda.maharashtra.gov.in.
Source: MMRDA-Tender | Image Credit (representational): MMRDA