MMRDA invites Tender appointment of General Consultant for Mumbai metro line 10 & line 12

Mumbai Metropolitan Region Development Authority (MMRDA) has invited Request for Proposal (RFP) from eligible bidders through MMRDA e-tendering Portal for GC-07A Appointment of General Consultant for Civil and System works of Mumbai Metro Line 10 (Gaimukh – Shivaji Chowk (Mira Road) and Mumbai Metro Line 12 (Kalyan- Taloja) of Mumbai Metro Rail Project of MMRDA, Mumbai.

  • Tender Ref No: MMRDA/Metro- PIU/0002704
  • Name of Work: GC-07A Appointment of General Consultant for Civil and System works of Mumbai Metro Line 10 (Gaimukh – Shivaji Chowk (Mira Road) and Mumbai Metro Line 12 (Kalyan – Taloja) of Mumbai Metro Rail Project of MMRDA, Mumbai.
  • Contract Period: 54 Months
  • Tender Document Download Start Date: 15/02/2022
  • Tender Document Download End Date: 25/03/2022
  • Pre-Bid Meeting: 28.02.2022
  • Last Date of Submission: 31.03.2022

Tender Schedule:

Sr No. Department Schedule Supplier Activity: Duration Start Date and Time End Date and Time
1 Tender Authorization and Publishing 0 Days 35 Minutes 15/02/2022 15/02/2022
2 Tender Document Download 38 Days 2 Hours 29 Minutes 15/02/2022 25/03/2022
3 Bid Preparation and Submission 44 Days 2 Hours 29 Minutes 15/02/2022 31/03/2022
4 Tender Closing 0 Days 29 Minutes
31/03/2022 31/03/2022
5 Online Control Transfer of Bid 0 Days 23 Hours 29 Minutes 31/03/2022 01/04/2022
6 Opening Envelope A – Tender Fees, EMD 0 Days 7 Hours 04/04/2022 04/04/2022
7 Opening Envelope B – Technical Bid 0 Days 7 Hours
04/04/2022 04/04/2022
8 Opening Envelope C – Financial Bid 0 Days 7 Hours       04/04/2022 11:00 AM 04/04/2022 04/04/2022
9 Tender Award

About Metro Line 12 and 10:

  • The Mumbai Metro Rail Project i.e. Line 12 from Kalyan to Taloja (Extension of Line 5 metro  project) is proposed to be constructed at an estimated cost of Rs.4738.00 Crore with all taxes and land cost. 
  • The total length of the line is planned to be 20.756 kilometres (12.89 mi)..
  • The Mumbai Metro Line 10 Project i.e. from Gaimukh to Shivaji Chowk (Mira Road) is proposed to be constructed at an estimated cost of Rs.3821.00 Crore with all taxes and  land cost. 
  • Length of this corridor is 9.209 km, having 4 stations.

Tenderers are requested to note that tender is being invited through e-procurement. Tender documents can be obtained online from MMRDA e-Tendering Portal: https://etendermmrda.maharashtra.gov.in.


Source: MMRDA-Tender | Image Credit (representational): MMRDA

Be the first to comment

Leave a Reply

Your email address will not be published.


*