
The Mumbai Metropolitan Region Development Authority (MMRDA) has invited Tender for Appointment of Contractor for Construction of Linkway FOBs at Metro Line-7 Stations-Phase- 1 (Part- A): Dindoshi, Poiser & Devipada.
- Tender Ref No.: MMRDA/TC/0002562
- Name of Work: Appointment of Contractor for Construction of Linkway FOBs at Metro Line-7 Stations-Phase- 1 (Part- A): Dindoshi, Poiser & Devipada.
- Contract Period: 07 Months
- Estimated Cost: INR 15,78,96,620/-
- Bid documents download: From 06/09/2021 To 01/10/2021
- Last date of online submission: 01/10/2021
Tender Schedule:
Sr No. | Department Schedule | Supplier Activity | Duration | Start Date and Time | End Date and Time |
1 | Tender Authorization and Publishing | 0 Days 2 Hours 58 Minutes | 06/09/2021 11:57 AM | 06/09/2021 02:55 PM | |
2 | Tender Document Download | 25 Days | 06/09/2021 03:00 PM | 01/10/2021 03:00 PM | |
3 | Bid Preparation and Submission | 25 Days | 06/09/2021 03:00 PM | 01/10/2021 03:00 PM | |
4 | Tender Closing | 0 Days 2 Hours 59 Minutes | 01/10/2021 03:01 PM | 01/10/2021 06:00 PM | |
5 | Online Control Transfer of Bid | 0 Days 23 Hours 59 Minutes | 01/10/2021 06:01 PM | 02/10/2021 06:00 PM | |
6 | Opening Envelope A – Tender Fees, EMD | 0 Days 7 Hours | 04/10/2021 11:00 AM | 04/10/2021 06:00 PM | |
7 | Opening Envelope B – Technical Bid | 0 Days 7 Hours | 04/10/2021 11:00 AM | 04/10/2021 06:00 PM | |
8 | Opening Envelope C – Financial Bid | 0 Days 7 Hours | 04/10/2021 11:00 AM | 04/10/2021 06:00 PM | |
9 | Tender Award |
Note:- The e-Tender can be downloaded from e-Tendering Portal: https://etendermmrda.maharashtra.gov.in.
Any additional information, Corrigendum & help for uploading & downloading the e-tender, may be availed by contacting MMRDAs e-tendering service desk at the following id: etendersupport@mailmmrda.maharashtra.gov.in or call us on 022-26597445.
About Mumbai Metro Line 7 (Andheri East – Dahisar East):
- Metro Line 7 from Andheri (E) to Dahisar (E) is 16.475 km. long elevated corridor with 13 stations.
- It shall provide interconnectivity among the existing Western Express Highway, Western Railway, Metro Line 1 (Ghatkopar to Versova), the ongoing Metro Line 2A (Dahisar to D N Nagar) and the proposed Metro Line 6 (Swami Samarth Nagar to Vikhroli).
- It shall facilitate smooth and efficient interchange with the suburban rail system and MRT system at Andheri, JVLR and Dahisar.
- It shall provide connectivity between the Central Mumbai and the Northern suburban Mumbai.
- It shall provide rail based access to the Mumbai International Airport (CSIA), SEEPZ, National Park and other commercial and geographical landmarks.
- Dedicated Depot is planned at Dahisar in an extent of 15 Ha.
- It shall reduce the current travel time by anything between 50% and 75% depending on road conditions.
Source: MMRDA-Tender | Image Credit (representational): MMRDA
Be the first to comment