In continuation to the tender for appointment of Project Management Consultant for Mumbai Metro Line 2A & 7, the Mumbai Metropolitan Region Development Authority (MMRDA) has now invited Request for Proposal (RFP) from eligible bidders through MMRDA e-tendering Portal for Appointment of Contractor for Construction of Linkway FOBs at Metro Line-7 Stations — Package-1 (Part- A), (Part- B) and (Part- C). The RFP details are as under:
Package- 1 (Part- A):
- Tender Ref No: MMRDA/TC/0002396
- Name of Work: Request for Proposal for “Appointment of Contractor for Construction of Linkway FOBs at Metro Line-7 Stations – Package-1 (Part- A) Gundavali 1.
Package- 1 (Part- B):
- Tender Ref No: MMRDA/TC/0002397
- Name of Work: Request for Proposal for “Appointment of Contractor for Construction of Linkway FOBs at Metro Line-7 Stations – Package- 1 (Part- B): Gundavali 2”.
Package- 1 (Part- C):
- Tender Ref No: MMRDA/TC/0002398
- Name of Work: Request for Proposal for “Appointment of Contractor for Construction of Linkway FOBs at Metro Line 7 Stations – Package- 1 (Part- C): Goregaon (East) – 1&2 and Aarey – 1&2.”
Key Dates:
- Bid document download: From 30.03.2021 Till 23.04.2021
- Pre-Bid Meeting: 06.04.2021
- Date of closing: 23.04.2021
- Date of Opening: 26.04.2021
Tender Schedule:
Sr No. | Department Schedule | Supplier Activity | Start Date | End Date |
1 | Tender Authorization and Publishing | Tender Document Download | 30/03/2021 | 30/03/2021 |
2 | Bid Preparation and Submission | 30/03/2021 | 23/04/2021 | |
3 | 30/03/2021 | 23/04/2021 | ||
4 | Tender Closing | 23/04/2021 | 23/04/2021 | |
5 | Online Control Transfer of Bid | 23/04/2021 | 24/04/2021 | |
6 | Opening Envelope A – Tender Fees, EMD | 26/04/2021 | 26/04/2021 | |
7 | Opening Envelope B – Technical Bid | 26/04/2021 | 26/04/2021 | |
8 | Opening Envelope C – Financial Bid | 26/04/2021 | 26/04/2021 |
The e-RFP shall be available for free download on registration at https://etendermmrda.maharashtra.gov.ina s per the above-mentioned dates. The submission of the e-RFP response is through MMRDA e-tendering Portal only. For participating in this e-RFP and avoiding last minute technical challenges if any, all the bidders shall follow the guidelines mentioned in the e-RFP document on e-tendering Portal. The bidders shall go through the e-tender SOP and FAQs hosted at MMRDA e-tendering Portal for detailed understanding of e-tendering submission process. For any e-tendering support, bidders shall mail MMRDA e-tendering Helpdesk at etendersupport@mailmmrda.maharashtra.gov.in or call Helpdesk on 022-2659 7445.
About Mumbai Metro Line-7 (Andheri East – Dahisar East):
- Metro Line-7 from Andheri (E) to Dahisar (E) is 16.475 km. long elevated corridor with 13 stations.
- It shall provide interconnectivity among the existing Western Express Highway, Western Railway, Metro Line-1 (Ghatkopar to Versova), the ongoing Metro Line-2A (Dahisar to D N Nagar) and the proposed Metro Line-6 (Swami Samarth Nagar to Vikhroli).
- It shall facilitate smooth and efficient interchange with the suburban rail system and MRT system at Andheri, JVLR and Dahisar.
- It shall provide connectivity between the Central Mumbai and the Northern suburban Mumbai.
- It shall provide rail based access to the Mumbai International Airport (CSIA), SEEPZ, National Park and other commercial and geographical landmarks.
- Dedicated Depot is planned at Dahisar in an extent of 15 Ha.
- It shall reduce the current travel time by anything between 50% and 75% depending on road conditions.
Present Status:
Updates as on 01th March 2021.
Sr. No. | Name of Work | Status |
1 | Soil Investigation Works | 100 % of the soil investigation work for Pier foundation is completed. |
2 | Utility Works | 99.5% completed. |
3 | Piling Works | 100% completed. |
4 | Pile Cap Works | 100% completed. |
5 | Pier Works | 100% completed. |
6 | Pier Cap Works | 98% Cast and 96 % Erected. |
7 | U Girder Works | 98 % Cast and 90 % Erected. |
8 | I Girder Works | 86 % Cast and 75 % Erected. |
9 | Deck Slab (Via) | 77% completed. |
10 | Station Work | 85.36% completed. |