MUTP-2 Update: Tender invited for Construction of balance work of four lane Road Over Bridge (ROB)

Mumbai Railway Vikas Corporation Limited (MRVC) has invited tender for Construction of balance work of four lane Road Over Bridge (2 X 39.62m long Open web through type Steel girder + 2×20.00m long RCC T-type Beam for two lanes of ROB and 2 X 39.62m + 1 x 20.00 m RCC T type Beam for other two lanes of ROB) near Mumbra ByePass flyover at Km 38.88 (Highway chainage 133/800 of NH 4) including fabrication of balance steel girder parts, Assembling & launching of steel girders, construction of approaches including earth filling, Re-grading existing Road work, dismantling old Road Over Bridge, etc from Km. 38.20 to Km. 39.20 and other miscellaneous works in connection with provision of 5th and 6th line between Thane and Diva Stations of Central Railway(MUTP-II)

  • Tender Reference Number: MRVC/W/150/TNA-DW/ROB/2021/2
  • Name of Work: Construction of balance work of four lane Road Over Bridge (2 X 39.62m long Open web through type Steel girder + 2×20.00m long RCC T-type Beam for two lanes of ROB and 2 X 39.62m + 1 x 20.00 m RCC T type Beam for other two lanes of ROB) near Mumbra ByePass flyover at Km 38.88 (Highway chainage 133/800 of NH 4) including fabrication of balance steel girder parts, Assembling & launching of steel girders, construction of approaches including earth filling, Re-grading existing Road work, dismantling old Road Over Bridge, etc from Km. 38.20 to Km. 39.20 and other miscellaneous works in connection with provision of 5th and 6th line between Thane and Diva Stations of Central Railway(MUTP-II)
  • Approximate Estimated Cost: INR 31,53,39,626.00/-
  • Period of Completion: 15 Months
  • Document Download Start Date: 17-01-2022
  • Document Download End Date: 15-02-2022 
  • Tender Submission Start Date: 17-01-2022
  • Tender Submission End Date: 15-02-2022
  • Tender Bid Open Date: 15-02-2022

About the Project:

Network Expansion:

  • 5th& 6thLines CSTM-Kurla
  • 5th& 6thLines Thane-Diwa.
  • 6thLine Borivali-Mumbai Central
  • Extension of Harbour line from Andheri to Goregaon
  • Completion of DC to AC Conversion on Central Railway.

(CSTM Thane Section) Service Efficiency Improvement:

  • Station Improvement and Trespass ControlScheme.
  • Maintenance facilities for EMUs
  • Stabling lines for EMUs.

Rolling Stock:

  • EMU procurement & manufacture.

Technical  Assistance & Institutional strengthening .MUTP PHASE III nfrastructure Inputs being provided (CSTM Thane Section)Resettlement & Rehabilitation of Project Affected Households.

Benefits of MUTP Phase II: 

  • Segregation of suburban train operations from the main line passenger & freight services.
  • 12/15 car trains running on the suburban lines.
  • Provision of additional 864 New Coaches – Increase of 30% capacity over & above MUTP Phase I.
  • Bringing down the passenger per 12 coach train to 4000 as against existing 6000
  • Conversion of 1500 V DC to 25 kV ACTraction on Central Railway.
  • Reduction in journey time.
  • Saving in Electrical Energy

The draft Terms of Reference (Draft ToR) is available at MRVC website https://mrvc.indianrailways.gov.in/


Source: MRVC- Tender | Image Credit (representational): MoR