
Search Results for East-West corridor




Kolkata Metro’s GM, Shri P. Uday Kumar Reddy inspects East-West metro corridor
Shri P. Uday Kumar Reddy, General Manager, Metro Railway inspected Sealdah to Salt Lake Sector V stretch of East-West Metro Corridor (Green Line). Shri Reddy reached Sealdah station in the morning and started the inspection […]

IRCON invites tender for construction of depot near Dhangawan yard, track linking & New BG electrified double railway line for East-West Rail Corridor in Chhattisgarh
IRCON International Limited has invited an online e-Tender for Setting up of NTC base depot near Dhangawan yard with manual track linking works between NTC depot to Pendra Station including supply of material (except supply […]

Kolkata Metro update: Extension from Phoolbagan to Sealdah of East-West Metro corridor to be opened
Hon’ble Minister of Women & Child Development and Minority Affairs, Smt. Smriti Zubin Irani has inaugurated the Sealdah Metro station. The much awaited extension from Phoolbagan to Sealdah of East-West Metro corridor will be inaugurated […]

IRCON invites bids for supply of sleepers for East-West Rail Corridor and East Rail Corridor-II of Chhattisgarh Railway Project
IRCON International Limited has invited online bids in two packet systems on prescribed forms from bonafide firms/ companies having requisite experience and financial capacity for execution of the work detailed in the table given below. […]

RITES invites tenders for Railway Electrification works for East-West Rail Corridor in Chhattisgarh
RITES Ltd., a Public Sector Enterprise under the Ministry of Railways, has invited tenders for the work of “Design, Drawing, Supply, Erection, Testing & Commissioning of 25 KV OHE system with modification for Rail infrastructure […]

Shri Manoj Joshi, GM, Kolkata Metro Railway inspects Howrah Maidan to Esplanade stretch of East-West Metro Corridor
Shri Manoj Joshi, General Manager, Metro Railway made detailed inspection of Howrah Maidan to Esplanade stretch of East-West Metro Corridor on 09. 09.2021. He started his inspection from Howrah Maidan Metro station along with senior […]

Kolkata Metro update: Trial run begins upto Sealdah on East-West Metro corridor
Metro Railway plans to extend East-West Metro services up to Sealdah by partially operating Sealdah station (East Bound line only). This section will add another 2.33 Kms and one station (Sealdah) in 6.97 Kms already […]