The Indian Railways has sanctioned the Final Location Survey for new rail lines connecting Nashik and Dahanu via Trimbakeshwar, enhancing regional connectivity in Maharashtra, while the four projects will improve over South Eastern Railway. This strategic project aims to boost tourism, foster economic growth, and provide seamless travel for devotees visiting key religious sites in Nashik.
Enhancing Connectivity:
- The new Nashik-Dahanu rail line will span approximately 100 km, linking Nashik with Dahanu via Trimbakeshwar and Vangaon.
- This line will significantly improve connectivity between major towns in Maharashtra’s Nashik and Palghar districts.
- It will facilitate better access to religious and tourist spots, including Trimbakeshwar temple and Panchavati, enhancing the travel experience for visitors.
Impacts of Sanctioned Line:
- The project is expected to boost tourism, especially for devotees visiting Trimbakeshwar, one of the 12 Jyotirlingas, and other heritage sites in Nashik.
- Improved rail connectivity will foster economic growth in the Nashik and Palghar districts by connecting multiple towns and promoting regional development.
- The new rail line is poised to enhance passenger convenience and reduce travel time between Nashik and Dahanu.
Benefits:
- The rail line will provide a vital link for thousands of pilgrims and tourists, enhancing the overall accessibility to key religious and cultural destinations.
- The new connectivity is expected to generate economic opportunities, boost local businesses, and support the development of the region’s infrastructure.
- Enhanced rail connectivity will contribute to Maharashtra’s broader transportation network, improving the overall travel experience for commuters.
Final Location Survey for 4 New Railway Projects of SER:
Sr. No. | Name of Projects | Approx. length (in Km) | Cost in INR |
1 | Doubling of Mohuda Khanoodih Gomoh section | 22.4 | 44,80,000/- |
2 | Direct connectivity between Tata Marshalling Yard and Tata-Badampahar route | 05.0 | 10,00,000/- |
3 | Double line Bypass from Jakpur to Benapur avoiding Kharagapur and Nimpura Yard with Fly over at Benapur and Jakpur in Down direction to avoid surface crossing | 11.0 | 22,00,000/- |
4 | Fly over at Rupsa for connecting Kharagpur – Bangriposi and Bangriposi to Bhadrak to avoid surface crossing. | 35.0 | 70,00,000/- |
Total | 73.4 | 1,46,80,000/- |
Conclusion:
The Nashik-Dahanu rail line is a strategic initiative by Indian Railways to strengthen Maharashtra’s transportation network. By connecting key towns and boosting tourism, this project is set to play a crucial role in the state’s economic and infrastructural growth, enhancing the quality of life for residents and visitors alike.
Source: SER+CR – Press Release | Image Credit (representational): MoR