RLDA invites tender for development of multi-functional complexes at various railway stations for 45 years

Rail Land Development Authority (RLDA) has invited Proposal through e-tendering mode for Grant of lease for development of multi-functional complexes (MFCs) at Jhargram, Bharatpur, Bankura, Krishnanagar City Junction, Sikar, Dhakuria, Hisar and Patiala railway stations for 45 Years.

  • Tender Reference Number: RLDA/RFP/MFC/06 of 2022
  • Name of Work: Grant of lease for development of multi-functional complexes (MFCs) at Jhargram, Bharatpur, Bankura, Krishnanagar City Junction, Sikar, Dhakuria, Hisar and Patiala railway stations for 45 Years.
  • Construction Period: 02 Years
  • Document Download Start Date: 22nd December, 2022
  • Document Download End Date: 06th February, 2023
  • Pre-Bid Meeting: 30th December, 2022
  • Bid Submission Start Date: 22nd December, 2022
  • Bid Submission End Date: 06th February, 2023
  • Bid Opening Date: 06th February, 2023

General:

  • The information contained in this Request for Proposal (hereinafter referred to as “Bid”) document or subsequently provided to the Bidders, whether verbally or in documentary form by or on behalf of the Rail Land Development Authority (RLDA), their employees or any of its agencies/consultants/advisors, is provided to the Bidder(s) on the terms and conditions set out in this Bid document and all other terms and conditions subject to which such information is provided.
  • The purpose of this Bid document is to provide the Bidders with information to assist the formulation of their Eligibility and Financial Proposal. This Bid document does not purport to contain all the information for all the persons, and it is not possible for RLDA, their employees or any of its agencies/consultants/advisors to consider the business/investment objectives, financial situation and particular needs of each Bidder who reads or uses this Bid document.
  • Each Bidder should conduct its own investigations and analysis, and should check the accuracy, reliability and completeness of the information in this Bid document and where necessary obtain independent advice from appropriate sources.
  • RLDA, their employees or any of its agencies/consultants/advisors make no representation or warranty and shall incur no liability under any law, statute, rule or regulation as to the accuracy, reliability or completeness of the Bid document.
  • RLDA may in its own discretion, but without being under any obligation to do so update, amend or supplement the information in this Bid document.

Scope of the Project:

  • The following shall supplement the Scope of the Project specified in Article 2 of GCLA.
  • The Lessee shall, at its own risk, cost and expense, arrange to design, finance, construct and develop the MFC(s) at the Sites(s) within a maximum period of 24 (Twenty Four) months from the Effective Date in terms of the Lease Agreement.
  • MFCs being railway’s operational buildings, approval of plans from local authorities is not required and only approval of Nodal Officer of RLDA shall be required. The Nodal Officer shall give approval to plans subject to the consultation by Lessee with the Urban Development Authority in urban areas and compliance of other statutory requirements of building laws by the Lessee.
  • The Lessee shall arrange at its own cost power supply, water supply and sanitation facilities and other utilities for the MFCs where Railway is not able to provide these services but on Railway’s prescribed charges.
  • Railways shall provide suitable access from surrounding railway land for bringing these utilities to the MFCs without any way and leave charges. However, it will be the Lessee’s responsibility to follow the local building bye laws and take all necessary approvals from competent authorities (including environmental clearances, permissions for cutting trees, etc) wherever required.
  • Any charges for obtaining such approvals from the competent authorities shall be paid by the Lessee to the authority (ies) concerned. RLDA will facilitate the Lessee in dialogue/obtaining such permissions from local authority on best effort basis.
  • The Lessee shall complete the construction and commission of the first phase with a minimum built up area of 200 sqm and provide rail user facilities preferably like shopping, book stall, ATM, food stall, PCO booth, medicine and variety store etc. at each MFC Site within a period of 9 months from the date of handing over of the Site to the Lessee.
  • In case it is not feasible to operationalize 200 sqm. earlier than the main MFC building due to size or layout constraint of the specific MFC/Site, suitable extension may be considered in terms of Clause 14.2.2 of GCLA by RLDA on specific request with justification by the Bidder.
  • The Lessee shall prepare the plan for each MFC subject to fulfilment of requirements of the Lease Agreement and the Built Up Area not exceeding the maximum limit specified therein. While preparing the development plan, the Lessee shall provide at least 15% extra parking facilities within the MFC than required as per bye laws of the local authorities for the proposed development and in no case the developed parking shall attract vehicles more than its design capacity.
  • The Lessee shall be permitted to market and sub-lease Built Up Area for usage for any legal and lawful activities preferably rail user facilities like shopping, food stalls/restaurants, book stalls, PCO booths, ATMs, medicine and variety stores, budget hotels, parking etc. but excluding the activities that attract crowd like theatres, cinemas, or any other such activity having periodic showtimes. However, multiplexes up to a sitting capacity of 200 persons for each screen may be allowed.
  • The Lessee shall design and construct all permanent civil structures(s) for the Design Life. While designing the structure to be built on the Site, the Lessee shall adopt the elevation and outside finishes of the building in such a manner that it is aesthetic and matches with the architecture of the railway station building as well as the local architectural ethos of the city where the Site is located.
  • The Lessee will also try to depict local history and culture by way of suitable murals, paintings etc. in the public areas. The design should be based on construction material and construction methodology that causes minimum hindrance to smooth movement of passengers and vehicles to and from the railway station.
  • The Lessee shall design and provide a suitable signage for the MFC building depicting the name of the complex as “Multi-Functional Complex”, name of RLDA and the Lessee along with their respective logos after the completion of the Project. The Lessee shall submit the design of the signage to the Nodal Officer for approval.

Reserve Price for Lease premium for above MFCs are as below:

Jhargram – Rs. 87.00 LakhBharatpur – Rs.156.00 LakhBankura – Rs.157.00 LakhKrishnanagar City Jn.– Rs.88.00 Lakh
Sikar – Rs.241.00 LakhDhakuria – Rs.155.00 LakhHisar– Rs.178.00 LakhPatiala – Rs.130.00 Lakh

Bid Security:

S. No.Name of Site(s)Amount of Bid Security for each Site (Rs.)
1Jhargram10.00 Lakh
2Bharatpur15.00 Lakh
3Bankura15.00 Lakh
4Krishnanagar City Jn.10.00 Lakh
5Sikar15.00 Lakh
6Dhakuria15.00 Lakh
7Hisar15.00 Lakh
8Patiala15.00 Lakh

About RLDA:

  • Rail Land Development Authority (RLDA) is a statutory body under the Ministry of Railways for the development of Railway land.
  • It has four key mandates as a part of its development plan, namely leasing of commercial sites, colony redevelopment, station redevelopment and multi-functional complexes.

The complete document can be downloaded from www.tenderwizard.in/RLDA


Source: RLDA- Tender | Image Credit (representational): MoR