RVNL invites tender for various works including track linking and doubling between Bhandai to Kitham on Agra division of North Central Railway

Rail Vikas Nigam Limited (RVNL) has invited bids under Single Stage Two Envelope Bidding procedure In Two Packages for Construction of roadbed, minor bridges and track linking (excluding supply of rails and sleepers, thick webs switches and special sleepers) in connection with doubling between Bhandai to Kitham on bypass alignment (26.5 km) on Agra division of North Central Railway in Uttar Pradesh state of India.

  • Tender Reference Number: RVNL/CPM/AGC/MTJ-JHS/BHA-KXM BYPASS/OT
  • Name of Work: Construction of roadbed, minor bridges and track linking (excluding supply of rails and sleepers, thick webs switches and special sleepers) in connection with doubling between Bhandai to Kitham on bypass alignment (26.5 km) on Agra division of North Central Railway in Uttar Pradesh state of India.
  • Approx. Cost of Work: INR 229.21 Crore
  • EMD: INR 02 Crore
  • Period Of Work: 24 months
  • Document Download / Sale Start Date: 18th November, 2022
  • Document Download / Sale End Date: 03rd January, 2023
  • Pre-Bid Conference Date: 06th December, 2022
  • Bid Submission Start Date: 18th November, 2022
  • Bid Submission End Date: 03rd January, 2023
  • Tender Opening Date: 03rd January, 2023

Scope of Work:

  • The proposed work is in connection with the doubling of track between Bhandai and Kitham (26.5 Kms) on Bypass Alignment.
  • The tendered work is part of the project for construction of the third Railway line between Bhandai & Kitham of North Central Railway. The works are located on the Bypass alignment between Bhandai to Kitham and the details are given in the bid document. The bridges and track have to be made on new Bypass alignment.
  • The section of Bhandai to Kitham Bypass (Chainage 0.00 to 26500) is a part of the third Railway line between Mathura to Jhansi. It is proposed to take up the work of this section as it is equally important from the point of view of both passenger and freight traffic.
  • The work on the entire stretch between Bhandai -Kitham (Chainage 0.00 to 26500) can be taken up simultaneously for execution of work.
  • The tendered work is part of the project for construction of the third Railway line between Bhandai & Kitham of North Central Railway. The works are located on the Bypass alignment between Bhandai to Kitham and the details are given in the bid document. The bridges and track have to be made on new Bypass alignment.
  • The section of Bhandai to Kitham Bypass (Chainage 0.00 to 26500) is a part of the third Railway line between Mathura to Jhansi. It is proposed to take up the work of this section as it is equally important from the point of view of both passenger and freight traffic. The work on the entire stretch between Bhandai -Kitham (Chainage 0.00 to 26500) can be taken up simultaneously for execution of work.
  • Approach to project length is through village road, canal service roads, Other District Roads and National highway, at a reasonable number of locations (13nos.). The details of land acquired / proposed to be acquired for the project are given in preceding Para. This land caters for construction and operation of the proposed line.
  • The contractor shall plan for approach roads to the various sites of work after conducting a detailed site survey and should include the cost of inputs for any such approach roads in his bid for the work.

Ballast Queries in the area:

  • The established ballast queries in this area are as under: Billowa (Gwalior District). Bidders should find out the capacity of the quarries and accordingly plan procurement of ballast either from the existing quarries or establish their own queries and crushing arrangements.
S. No.DescriptionProvision of double line between Bhandai-Kitham
1Length of Section26.50 Kms
2Ruling Gradient200 compensated
3Maximum Degree of curvature2 Degree
4Major Bridges17 nos.
5Minor Bridges20 Nos.
6RUBsNIL
7No. of StationsNIL
8No. of Junction StationsNIL
9LC gatesNIL
10Loading Standard25 T Axle Load

Minor Bridges:

  • The list of minor bridges to be constructed is as under:
S. No.Br. no.Chainage (m)SpanType of BridgeRemarks
121495.051x6x5 mRCC BOXFor Double Line
254169.671x6x5 mRCC BOXFor Double Line
364605.031×3.05 mRCC BOXFor Double Line
485560.071x6x5 mRCC BOXFor Double Line
596485.4161x6x5 mRCC BOXFor Double Line
6107207.541x6x5 mRCC BOXFor Double Line
7128671.921x6x5 mRCC BOXFor Double Line
8139605.1061x6x5 mRCC BOXFor Double Line
91611243.651x 9.15 mPSC SLABFor Double Line
101812661.921x6x5 mRCC BOXFor Double Line
112314446.4251x6x5 mRCC BOXFor Double Line
122414905.2841x6x5 mRCC BOXFor Double Line
132515368.541x 9.15 mPSC SLABFor Double Line
142716512.0311x6x5 mRCC BOXFor Double Line
152917046.01211x 9.15 mPSC SLABFor Double Line
163018096.881x6x5 mRCC BOXFor Double Line
1731194601x6x5 mRCC BOXFor Double Line
183422584.081x6x5 mRCC BOXFor Double Line
193523423.671x6x5 mRCC BOXFor Double Line
203825715.341x6x5 mRCC BOXFor Double Line

Track Laying & Linking:

  • 60 Kg/90UTS rails on PSC sleepers with density of 1660 sleepers per km with 350 mm ballast cushion shall be provided for the main line. In station yards, for the loop lines, 52 Kg rails on PSC sleepers with a density of 1660 sleepers/Km with 350 mm ballast cushion have been proposed. The main line is proposed to be provided with LWR / CWR. Loop lines shall be provided with SWP/ LWR.
  • Yards will be tracked. Glued joints shall be provided wherever required. 60 Kg points and crossings on PSC fan shaped layouts have been proposed.
  • Hard Stone ballast of 65 mm size with 350 mm cushion on the main line and the turnouts and 350 mm cushion on loops and sidings shall be provided.
  • The work also involves slewing / regrading of existing tracks and relaying / dismantling of P-way and Points & crossings, wherever necessary.
  • After the formation is ready and cleared by the Engineer for track linking the rails (Single Rails/3 Rail Panels) shall be unloaded on the formation.
  • Flash butt welding shall be done to convert the single rails into LWR/CWR as per plan approved by RVNL by the contractor’s portable road trailer mounted flash butt welding machine.
  • If there is delay in formation being ready, single rails can be converted into 3/4 Rail Panels in depots and then these 3/4 Rail Panels can be converted into LWR/CWR after transferring them to formation.
  • PSC sleepers shall be transported by road and stacked near level crossings.
  • The required quantity of ballast to the maximum extent (not less than 2 Cum per metre length) shall be brought by contractor’s dumpers on the formation and spread on the proposed alignment by contractor’s grader.
  • The grader should spread and level the ballast in a width of 3.2 meter (Bottom) and cushion of 200 mm. The remaining quantity of ballast shall remain on the common cess of existing/proposed track, leaving clear space for linking of auxiliary track.
  • After laying of ballast is completed in a particular stretch between level crossings then auxiliary track shall be laid at a gauge of 3400 mm with centre line matching the proposed track.
  • Now the sleepers shall be lifted from the stacks near the level crossings with the help of hydra and kept on the formation between auxiliary tracks for being picked up by portals for leading them to point of laying in case portals are proposed to be used for transport and laying of sleepers.
  • Contractor shall bring his own mechanized portal equipment which will be capable of traveling on the auxiliary track and will transport the sleepers from L-Xing to the location of linking. At the location of laying, the sleepers shall be laid at the required spacing ensuring that the centre line of sleepers matches with the centre line of proposed track. Instead of portals, sleeper laying equipment which does not require use of auxiliary track, can also be used for laying of sleepers.
  • After the sleepers are laid on the ballast bed of 200 mm thickness, contractor shall arrange his own Rail Threader to pick up the auxiliary track rails from both sides and lay on the PSC sleeper at Rail Seat to complete the laying of track.
  • The ballast lying along the track shall be put in the track in the cribs and shoulders for taking up the work of lifting the track to provide a required cushion of 350 mm.
  • Track shall be lifted and aligned by small track machines. The lifting and aligning machine should be light in weight and should be transportable by road from one site to another. This lifting, aligning and tamping may be required in 2-3 phases until the desired clear cushion and proper alignment is achieved.
  • Behind the lifting aligning machine, a contractor’s small track machine capable of tamping to be deployed. The Tamping machine should have 8 Nos. of tamping tools so that one sleeper can be tamped completely per insertion. This light duty tamper should be self propelled and should be transportable by road from one place to another.
  • The contractor shall unload additional ballast over the track by his own mechanized means or manually as per site conditions and directions of Engineer to achieve desired ballast profile.
  • For achieving the desired cushion and to fill the inter-space of sleepers as well as crib ballast as per final profile, whatever ballast will be required in phases to be unloaded by the contractor with his own equipment and machinery.
  • The contractor, after sequence of linking, lifting, aligning and packing with his own tools, plants and equipments shall bring the track parameters in floating condition within the tolerance limits as specified in IRPWM
  • The track thus laid shall have speed potential of 45 kmph. After this Railway’s heavy on track tampers shall be made available for machine packing to achieve normal sectional speed.
  • Two packings shall be done by the contractor with Railway’s heavy on track tampers. After the first tamping the track shall be made suitable for speed potential of 75 kmph. The second tamping (final tamping) shall be done in design mode and the track shall be made suitable for maximum permissible sectional speed.
  • Profiling of ballast shall be done to achieve the ballast section as prescribed in IRPWM.

Tender documents can be downloaded from website https://rvnl.org/active-tenders-new


Source: RVNL- Tender | Image Credit (representational): MoR