The Gujarat Metro Rail Corporation (GMRC) Ltd. has invited open tenders for the work, “Development and Construction of Dream City Depot including Metro bhavan, OCC and associated E & M works under corridor C1, Sardhana to Dream city, in connection with Surat Metro Rail Project, Phase1, Package DC-01”

  • Tender No.: GMRC/CONS/DC 01/Surat/PH-1/2021
  • Approximate cost of work: INR 346.00 Crore
  • Completion period of Work: 20 Months
  • Pre- bid Meeting: 18-01-2021 

Scope of work:

The scope of work includes:

  • Construction of Boundary Wall of Depot complex, Metro Bhavan & OCC.
  • Earth work and Land Area Grading works.
  • Construction of service buildings, offices for O&M organization, operation control room, canteen, sub-stations etc. These will be RCC framed structures – column and beam type on open/raft/pile foundations.
  • Construction of workshop/shed structures, pre-engineering/ prefabricated, with roofing, ACP cladding, glazing etc.
  • Architectural Finishing works including granite/marble flooring, stone cladding, metal cladding and/or aluminium/glazing etc.
  • HVAC works in some buildings.
  • General electrification, E&M works, fire detection/suppression works, installation of heavy duty compressors, DG sets, EOT cranes, general illumination, light towers, BMS/LAN etc.
  • Water supply and drainage works.
  • Internal roads and Depot approach road, formation and final surfacing.
  • Cable trenches.
  • Landscaping.
  • Any other work associated with above scope that are necessary for commencing of Depot.

Tender documents can only be obtained online after registration of the tenderer on the website https://gmrc.nprocure.com.


Source: GMRC-Tender