Mumbai Metro-3 update: Flash Butt Welding Machine arrives from USA begins welding of rails
An important equipment, Flash Butt Welding Machine (FBW Machine), which will weld Head Hardened (HH) rails for the 33.5-km long Colaba-Bandra-SEEPZ Metro-3 corridor, has arrived in Mumbai and begun its work at the Chhatrapati Shivaji […]