
Rail News
Kolkata Metro update: Second trial run conducted on Noapara-Dakshineswar Metro extension
The second trial run of Noapara – Dakshineswar Extension stretch of North – South Metro has been conducted smoothly on 07.01.2021. The second trial rake started from Noapara at 11.19 a.m and reached Dakshineshwar at […]