USBRL Project
USBRL Project Update: 161 km out of the total 272 km length has been commissioned
The Udhampur-Srinagar-Baramulla Rail Link (USBRL) project (272 km) was sanctioned in 1994-95. Anticipated cost of the project is Rs 37,012 crore, against which, expenditure of Rs 26,786 crore has been incurred up to March, 2022 […]
USBRL Project Update: 12.895 km long tunnel on the Katra –Banihal section has a successful breakthrough
The USBRL (Udhampur Srinagar Baramulla Rail Link) is a National project undertaken by the Indian Railways for construction of a broad-gauge railway line through the Himalayas, with the aim of connecting the Kashmir region with […]
Insights on USBRL project undertaken by Indian Railways for construction of a broad-gauge railway line connecting the Kashmir region with the rest of the country
The USBRL (Udhampur Srinagar Baramulla Rail Link) is a National project undertaken by the Indian Railways for construction of a broad-gauge railway line through the Himalayas, with the aim of connecting the Kashmir region with […]