J. Kumar Infraprojects bags contract worth around Rs. 378 Crores from MMRDA for linking work between Link Road & Poonam Nagar of Mumbai Metro Line-6 project

J. Kumar Infraprojects Limited received Letter of Acceptance (LoA) from MMRDA for Design and Construction of the Flyover (Missing Links) adjacent to the alignment of Metro Line-6 of Mumbai Metro Rail Project worth Rs. 378,70,38,350 Crores.

More Details:

  • J. Kumar Infraprojects Limited has receipt of Letter of Acceptance (LoA) for the project: MMRDA/6/MMRP/CA-196: Design and Construction of the Flyover (Missing Links) from Link Road, Andheri (West) to Poonam Nagar (JVLR) adjacent to the alignment of Metro Line – 6 of Mumbai Metro Rail Project from M/s Mumbai Metropolitan Region Development Authority.
  • The estimated contract amount is Rs. 378,70,38,350/- (Rupees Three Hundred Seventy-Eight Crore Seventy Lakhs Thirty-Eight Thousand Three Hundred and Fifty Only (excluding GST).
  • Time Period by which the order/contract/s is to be executed is 30 months.

About J. Kumar Infraprojects Limited:

J. Kumar Infraprojects Ltd, is one of the few EPC companies to conform to ISO standards “ISO 9001:2015, ISO 14001:2015 & OHSAS 18001:2007” for Quality Management Systems, Occupational Health and Safety Management System and Environmental Management System.

JKIL has developed a niche in construction of Urban Infra Projects including Metros, Flyover, bridges etc. It is renowned for undertaking design and construction projects on a turnkey basis meeting their clients’ requirements to effect.

JKIL is focused on EPC projects, having a strong foothold in various sectors like Urban Infrastructure, Transportation Engineering, Piling & Civil Construction etc.

About Mumbai Metro Line 06 Corridor:

Metro Line-6, in between Swami Samarth Nagar to Vikhroli (EEH) has been proposed to provide further inputs in the infrastructure of Greater Mumbai. Proposed Metro line is 15.31 Km in length & running from Swami Samarth Nagar to Vikhroli (EEH) passing through Jogeshwari, WEH, Powai.

This line is fully elevated and it connects Western Express & Eastern Express Highways. It gives interchange facilities at Aadarsh Nagar of Line-2A,JVLR station of Line-7, Aaray Depot station of Line-3 and Gandhi Nagar of Line-4 at different locations.

It has 13 stations & most of the alignment is passing on the median of Jogeshwari-Vikhroli link road. Similar to other Metro lines it has Integrated ticketing system, Lifts, escalators & staircase facilities in addition to improved footpaths with rams for differently disabled and senior citizens.

From S.S. Nagar to Mahakali, out of 4.750Km(approx.), 2.58Km combined  Road flyover with Metro line will also be constructed on the same single pier at road median, to provide an additional transport facility, in collaboration with MCGM.

No major environmentally sensitive or archaeologically important areas are directly affected during the construction of this metro line. The main benefit is time saving for travelling between Andheri to EEH by 30-45 minutes.

Source: J. Kumar- Press Release | Image Credit (representational): Nagpur Metro


Join us for the upcoming Railway Innovation Summit with 400+ Top Rail & Metro Industry Leaders on 30th Jan, 2024 in New Delhi, India. Register here and participate in the summit.