MIA Construction bags contract for Multi Model Integration of 21 more stations of Delhi Metro’s Phase-3

In continuation to LOA for the Contract MMI/Civil/01 to M/s MIA Construction Pvt. Ltd., the Delhi Metro Rail Corporation (DMRC) has issued another Letter of Acceptance (LOA) to M/s MIA Construction for Multi Model Integration of 21 more Metro Stations of Phase-3 at the total cost of Rs. 11.29 Crores.

The work shall be completed within 07 months

In September this year, the DMRC had invited online open e-tenders for the work Contract MMI/Civil/02: Multi Model Integration of 21-Metro Stations viz Bhikaji Cama Place, Chirag Delhi, Greater Kailash, Hauz Khas, IGD, IIT, INA, Janpath, Jasola Vihar, Kalkaji, Munirka, Nehru Enclave, Okhla NSIC, Okhla Vihar, Panchsheel Park, R.K. Puram, Sadar Bazaar, Sarojini Nagar, Shanker Vihar, South Extension, Vinobapuri Metro Stations of Phase-III.

Scope of work:

  • Contractor will construct the works along with modification in MMI scheme as per reference drawings which includes kerbstone, paver block fixing, footpath, drainage, MS and SS works (wherever indicated in drawings), RCC and PCC works etc.
  • Contractor shall execute all the RCC work including foundation work for Pre- Engineered Building.
  • Contractor shall provide barricades, utilities as per reference Drawings/Site Conditions.
  • Contractor shall identify and divert existing utilities prior to start of work. Utilities must not be damaged at any cost. If due to some or the other reason, mishap occurs, it should be rectified immediately by the Contractor at his own cost under intimation of DMRC.
  • NOC & Approval of schemes of Diversion of Utilities from the concerned regulatory / statutory / Local Authority is the responsibility of the Contractor.
  • Demolition/dismantling of road, footpath, RCC drain or any type of drain, kerbstone, pavers, central verge, boundary wall, grill, etc. Tenderer must visit the site and ascertain actual magnitude of quantum of work involved for road, footpath, RCC Drain, kerbstone, pavers, overhead-utilities & underground, central verge, boundary wall, signages, grill, bus shelters etc. Retrieved materials obtained from demolition/dismantling shall sent to designated locations.
  • Contractor shall construct Drive way, Footpath, Horticulture and Ground Development works as per reference drawings.
  • Contractor shall submit detailed work programme for approval by DMRC.
  • Contractor shall submit method statement with ITP and checklists for approval by DMRC.
  • Contractor shall submit organization chart for approval by DMRC.
  • Contractor shall dispose C&D waste to designated recycling plant as per direction of DMRC.
  • Contractor shall ensure noise emission due to C&D activities does not exceed the standard decibel levels prescribed by CPCB.
  • Contractor shall follow following specifications for execution of Work.
  • Contractor shall carry out the all survey work with the help of total station and auto level for execution of the Work.
  • True and proper setting out and layout of the Works, bench marks and provision of all necessary labour, instruments and appliances in connection therewith as specified or as directed.
  • All aspects of quality assurance, including testing of materials and other components of the work, as specified or as directed. Nothing extra shall be paid.
  • The Contractor has to ensure cleanliness of the roads and footpaths by deploying man power for the same. The Contractor shall have to ensure proper brooming, cleaning and washing of roads and footpaths at regular interval or as and when required or directed throughout the entire stretch till the currency of the contract including disposal of sewage. Nothing extra shall be payable on this account.
  • Clearing of site and handing over of all the Works, as specified or as directed and  Maintenance of the completed Work during the period as specified.
  • Contractor shall provide Earthing and lightening protection wherever required.

Source: DMRC-Tender update | Image Credit: DMRC

Be the first to comment

Leave a Reply

Your email address will not be published.


*