In a landmark achievement for the Patna Metro Rail Project, the Tunnel Boring Machine (TBM)-01 celebrated its inaugural tunnel breakthrough at the Patna University metro station on Wednesday, 20th March 2024. This momentous occasion marks a significant leap forward in the city’s metro rail project, underlining the engineering prowess and dedication of the team involved.
More Details:
Patna Metro Rail Project achieved a significant milestone on Wednesday, 20th March 2024 as the 450-t EPB TBM -01 achieved its first tunnel breakthrough. The Tunnel Boring Machine (TBM), reached the Patna University metro station, marking the first tunnel breakthrough for the city-shaping Patna Metro. The breakthrough was initiated by Advisor (Special Works) Shri Daljeet Singh.
The TBMs work till date in this Project:
- The TBM was commissioned in the month of May 2023 at Moin Ul Haq stadium, which constructed a 1.5 km long tunnel between MUH and Patna university.
- TBM-1 has worked around the clock to build a 1.5 km of fully lined tunnel, which completes the first drive of its 1.5 km journey towards the Gandhi Maidan.
- Being a densely populated and old building structure, this stretch was one of the most challenging stretches of the Patna metro tunnelling.
Conclusion:
As the Patna Metro Rail Project continues to forge ahead, the successful tunnel breakthrough by TBM-01 at Patna University metro station stands as a beacon of progress and innovation. It heralds a new era of urban mobility in Patna, promising a future where the city’s transport infrastructure is aligned with the needs and aspirations of its people.
Source: Patna Metro – Press Release | Images Credit: Patna Metro
Join us for the upcoming 5th Rail & Metro Technology Conclave with 600+ Top Rail & Metro Industry Leaders on 23rd & 24th July, 2024 in New Delhi, India. Register here and participate in the summit.