The Railways has completed the construction of Eastern Dedicated Freight Corridor (EDFC), with 1176 km out of 1506 km of Western Dedicated Freight Corridor (WDFC) also completed to date.
More Details:
- The Ministry of Railways has taken up construction of two Dedicated Freight Corridors (DFCs) viz. Eastern Dedicated Freight Corridor (EDFC) from Ludhiana to Sonnagar (1337 Km) and the Western Dedicated Freight Corridor (WDFC) from Jawaharlal Nehru Port Terminal (JNPT) to Dadri (1506 Km).
- Construction of EDFC has been fully completed and 1176 KM out of 1506 KM of WDFC has been completed. The construction of Dedicated Freight Corridors will reduce the logistic cost, leading to development of new industrial hubs and Gati Shakti Cargo Terminals.
The comparative statement showing expenditure incurred and commissioning of DFCs in 2014 and in 2023 is as under:
Year | Cumulative Expenditure (₹ In Crores) | DFCs commissioned |
2014 (March, 2014) | 10,357 | Nil |
2023 (Till Oct, 2023) | 1,08,558 | 2513 Km |
Source: PIB- Press Release | Images Credit: Central Railway