RLDA invites bids for Consultancy Services for preparation of Detailed Project Report (DPR) for Redevelopment of Jodhpur Railway Station

Rail Land Development Authority (RLDA) has invited a single stage, online tender for Feasibility Study, Detailed Master Planning, Urban Designing, Engineering & Preparation of Detailed  Project Report (DPR) For Integrated Re-Development of Jodhpur Railway Station, Under Jodhpur Division of North Western Railway.

  • Tender Reference Number: RLDA/RFP/CT- 45 of 2021
  • Name of Work: Consultancy Services for Feasibility Study, Detailed Master Planning, Urban Designing, Engineering & Preparation of Detailed Project Report (DPR) for Integrated Redevelopment of Jodhpur Railway Station, under Jodhpur  Division of North Western Railway.
  • Document Download Start Date: 29-Sep-2021
  • Document Download End Date: 29-Oct-2021
  • Bid Submission Start Date: 29-Sep-2021
  • Bid Submission End Date: 29-Oct-2021
  • Bid Opening Date: 29-Oct-2021

Scope of Services:

The scope of services is divided into two parts.

  • The first part of Scope of Services pertains to preparing Technical Feasibility Report, Concept Plans and Master Plan for the development/redevelopment of Project Railway Station including its surroundings on the entire Railway land for preparation of station development plan along with  plan for commercial exploitation of land parcels (colony redevelopment  plan also to be included if required) and bid management. The scope for this shall be as follows:
  • The Consultant shall undertake this consultancy in order to achieve the objective  specified in Clause 2 above. The detailed scope of services specified below is based on Authority’s understanding of the scope of service. However,it should be noted that the scope of work specified below is not exhaustive. The Consultant may be  required to carry out  additional  works, if any, to meet the objectives stated above.
  • While Preparing the Technical Feasibility Report and Master Plan of the Project, the Consultant shall follow the standards and specifications laid down in the Manual.  The  basic objective underlying the Master Plan is to develop a schematic plan for efficient handling of passengers and a schematic plan for efficient handling of passenger operations besides providing facilities for maintenance and allied facilities such as parking, inter-modal transfer and in-coming/outgoing road traffic at the Station.
  • The Technical Feasibility Report and Master Plan to be prepared by the Consultant shall contain preliminary designs and sufficient details to judge the constructability and feasibility of various layouts as well as the estimated cost related to such development. The phasing the Mandatory Works/Commercial Development shall be done on the basis of costs thus worked out and the revenue realization strategy prepared by Authority.
  • During actual execution, alternate layouts may be proposed based on the vision of the real estate developer, but the Consultant has to ensure that the master plan is not challengeable on architectural, technical or practical considerations. It will be the Consultant’s responsibility to fully defend the solutions proposed by him should these be questioned by MOR, Authority or the Contractor/Developer at any stage of the planning of Mandatory Works and/or bidding process for award  of contract for Mandatory Works  and Commercial Development. 
  • Once the  bid  documents are released, the  Consultant shall prepare replies to the written queries made by the bidders on the technical aspects of the bid documents.
  • The Consultant shall take part in the pre-bid conference for award of tender/concession and furnish such technical clarifications as may be called for.
  • The Consultant shall give a modular cost assessment of various infrastructure facilities proposed for station redevelopment.
  • The second part of Scope of Services pertains to Financial Viability assessment of the project proposal. The Financial Viability Assessment/Valuation shall include assessment of the Viability of alternatives.
  • The Consultant shall also assist the other consultants like Transaction Advisor, Legal  Adviser etc engaged by Authority by furnishing technical schedules and such clarifications as may be required for contractual, legal and financial issues for 1st phase of Mandatory Works and Commercial Development.

The outline scope of services to be performed by the Consultant shall include but not limited to the following:

  • Review of previous reports(ifany)/available plans/drawings/data and verify the available drawings details at the site.
  • Traffic Study and development of integrated traffic Plans.
  • Studies, Surveys and Investigations:
    • Engineering Survey.
    • Collection of land plans and master plan of station if any.
    • As certaining condition,ownership and usage of structures\.
    • Exiting utilities mapping,assess and plan permanent and temporary diversion utilities.
    • Land Due Diligence(as certaining land title in favour of Railways from the concerned Authorities)as certaining land title in favour of Railway.
    • Building condition survey; and Study of identification of sensitive structures.
    • Over lapping of survey and development plan on Google maps,revenue maps etc.
    • Soil exploration for preliminary design of structures.
  • Applicable Development Control Norms.
  • Assessment of additional requirements of utility infrastructure such as power, water, solid waste management, sewage treatment etc as well as their availability for the Project.
  • Relocation plan of buildings and structures.
  • Development of Concept Plans & Master Plan of the project: The Consultant Shall follow the applicable laws, by laws and Master Plan of the city with a view toenablingan ‘in principle’ approval of municipal authorities.
  • Construction methodology,sequencing,scheduling and time frame.
  • Social impact assessment including Resettlement & Rehabilitation Plan (R&R),if any.
  • Environment Impact Assessment and to actively work with Authority and obtain environmental clearance of the entire Project,if required.
  • Heritage Impact Assessment,if required.
  • Preliminary Designs and review/update of design criteria/outline specifications for the Mandatory Works and Architectural Controls for the Project including areas identified for commercial and/or other development identified in the MasterPlan.
  • Project Cost and Cost Estimates; (facility wise).
  • Market assessment/Demand assessment of the alternative project proposals.
  • FinancialViability assessment of the alternative project proposal.
  • The Financial viability assessment/Valuation shall include assessment of the viability of alternatives as discussed with RLDA/Railway Authority. The relevant parameters and guidelines such  as IRR,Equity IRR etc may be provided by RLDA.
  • Prepare submissions (if required, its revision also), for the purpose of obtaining  in  principle statutory approval/clearances for the Master Plan and obtaining such clearances.
  • Preparation of various Technical Schedules for the tenders for complete Mandatory Works.
  • Management of technical aspects of Bid Management for the first phase of Mandatory Works  and Commercial Development. The phasing of Mandatory Works and Commercial Development shall be as decided by the Authority in consultation with the Consultant and other consultants taking an overall view of railways operational requirements, Authority’s requirements, market conditions and overall interest of the Project and various stakeholders.

Bidders have to download the Bid documents from the e-procurement portal i.e. www.tenderwizard.in/RLDA.


Source: RLDA-Tender | Image Credit (representational): MoR