RVNL emerges lowest bidder for supply & installation of Integrated Tunnel Communication System for Sukhovi-Pherima new single line section of Lumding Division

Rail Vikas Nigam Limited (RVNL) emerges as the lowest bidder (L1) for “Supply, installation, testing & commissioning of integrated tunnel communication system in the Sukhovi-Pherima new single line section of Lumding Division.”

More Details:

  • Rail Vikas Nigam Limited (RVNL) emerges as the lowest bidder (L1) for “TRC: Sukhovi-Pherima: Supply, Installation, Testing & Commissioning of Integrated Tunnel Communication system in the Sukhovi-Pherima new single line section of Lumding Division of Northeast Frontier Railway.
  • The estimated cost of project is Rs. 28,73,92,870.84/-
  • Time period by which the order is to be executed is: 365 Days

About RVNL:

The company began its operation in 2005 with the appointment of a Board of Directors. The company was granted Miniratna status in September 2013. RVNL has been rated “Excellent” for the 9 successive years by the Department of Public Enterprises.

RVNL has also been ranked 1st amongst the Railway PSEs for the 4 times out of the last 5 years. The turnover of the company for the financial year 2019-20 has increased by 44.44%.

The authorised share capital of the company is Rs. 3000 crores with paid up share capital of Rs. 2085 crores. The company has been listed after its disinvestment of its stake of 12.16% of the company through IPO.


Source: RVNL- Press Release | Image Credit (representational): MoR