Gujarat Metro Rail Corporation (GMRC) Ltd. invites open tenders from eligible applicants, who fulfil qualification criteria for Bid for design, engineering, supply & procurement, erection, testing, commissioning and comprehensive operation & maintenance for 5 (five) years for 406 KW (AC) grid connected rooftop solar photovoltaic power project on rooftop of various buildings at two locations (i) site 1- Apparel Park Depot (206 KW) and (ii) site 2- Gyaspur Depot (200 KW) of Gujarat Metro Rail Corporation(GMRC) Limited, Gujarat.
- Tender Reference No: GMRC/SYSTEM/RFTP-02(R2)/DEPOT/EWNS/2023
- Name of Work: Bid for design, engineering, supply & procurement, erection, testing, commissioning and comprehensive operation & maintenance for 5 (five) years for 406 KW (AC) grid connected rooftop solar photovoltaic power project on rooftop of various buildings at two locations (i) site 1- Apparel Park Depot (206 KW) and (ii) site 2- Gyaspur Depot (200 KW) of Gujarat Metro Rail Corporation(GMRC) Limited, Gujarat.
- Estimated Cost of Work: INR 2,05,16,850 Crore
- EMD: INR 2,05,168 Lakh
- Commissioning of Project: 150 Days
- Operation and Maintenance Period: 05 Years
- Document Download /Sale Start Date: 27th June, 2023
- Document Download / Sale End Date: 28th July, 2023
- Pre- Bid Meeting: 07th July, 2023
- Bid Submission Start Date: 27th June, 2023
- Bid Submission End Date: 28th July, 2023
- Tender Opening Date: 28th July, 2023
Scope of Work:
- The Tender is invited for Design, Engineering, Supply & Procurement, Erection, Testing, Commissioning and Comprehensive Operation & Maintenance for 5 (five) years for 406 kw (ac) grid connected rooftop solar photovoltaic power project on rooftop of various buildings at two locations (i) Site 1- Apparel park depot (206 kw) and (ii) Site 2- Gyaspur depot (200 kw) of Gujarat Metro Rail Corporation (GMRC) Ltd., Ahmedabad in the state of Gujarat.
- In grid connected solar photo-voltaic (PV) systems, electricity generated is fed into the building loads that are connected to the grid through a service connection with surplus energy being fed into the grid and shortfall being drawn from the grid.
- Grid-connected solar PV systems have no battery storage and will not work during grid outage. For buildings with grid-connected solar PV systems, the service connection metre needs to be of the bidirectional type, whereby import kWh and export kWh are separately recorded.
- The modules should be manufactured in India only. Rest of the components can be procured from any source. However these items should meet the Technical specification and standards mentioned in RFP.
- The Bidder shall be obligated to perform following Scope of Work in relation to the Project. The Scope of Work of the Bidder includes, but is not limited to, the following mentioned below.
Project Development:
- Design, develop, procure, construct and commission, operate and maintain various roof mounted SPV power packs totalling to capacity of 406 kW (AC) (Site 1-206 kW and Site 2- 200 kW), which includes, but is not limited to the following:
- Solar PV modules.
- Components and parts used in solar PV systems should conform to the BIS or IEC or other international specifications, wherever such specifications are available and applicable.
- Mounting frames, structures, array foundation (grouting on terrace), earthing grid design, and module interconnection.
- All System Junction boxes.
- Power Conditioning Units (PCU) with monitoring.
- MPPT – Max power point tracking built in the PCU
- Appropriate AC power evacuation panels or inverters, according to Project Site requirements, with bus bars (in-built or otherwise) and circuit breakers.
- The nominal steady electrical characteristic of the system are as follows:
- Single/ Three phase AC at 50 Hertz plus or minus 0.5 Hertz
- Nominal voltage of 230 V/415V/11KV with +10% to -12.5% variation.
- Protection/isolation systems.
- Power and Control Cables.
- Earthing system for PV Array, DC power system, lightning protection system.
- Data monitoring system with remote monitoring facilities (Completely in scope of bidder).
- Transportation, unloading, and loading of all equipment at Project Site.
- Project Management including adherence to all requisite safety practices.
- The Project shall be designed and capable of being synchronised and within a frequency range of 47.5 to 52 Hz and voltage of 230V/415V/11kV
- Short circuit rating: As a part of the detailed design process, the Solar Company shall calculate the short circuit rating (minimum and maximum), and supply this information to the Procurer.
- Fire fighting (fire extinguisher and sand bucket with stand)
- Making arrangements for module cleaning in the plant area with cleaning mechanism;
- Control room/panel (whichever may be found appropriate) for the plant built in suitable material, with proper ventilation for temperature control of the equipment and serviceability within the building. Alternatively, the existing metre room can be utilised after proper designing and approvals of the building owner (GMRC).
- Installation and Commissioning of various roof mounted SPV power packs totalling to capacity of 406 KW (Site 1-206 kW and Site 2- 200 kW), that includes:
- Confirm feasibility of mentioned Solar PV System capacity along with site visit report, design and construction of foundations/grouting for holding module mounting structures without puncturing the roof; maintaining proper drainage of rain water over terrace through the installation area; cable routings through PVC pipes not obstructing the movement on the terrace as per site requirement.
- Before commencement of work, the Bidder has to obtain all approvals for related drawings, related vendors to be obtained from the concerned authorities including GEDA,CEI, DISCOM, GMRC etc.
- All drawings shall conform to relevant IS/IEC standards.
- Special care to be taken while designing all structures for modules to cater to heavy rainfall, strong winds and earthquakes that may be prevalent in the area.
- Serial Number (identification mark) must be permanently marked on all major components of the SPV systems and shall be fixed with strong adhesive on each equipment, as approved by GMRC/ Engineer.
- Undertake Pre-commissioning and Commissioning of all supplied equipment.
- Test running of the grid-connected solar Facility including load trials at Project Site, prior to handover and commencing energy export for metering.
- Grid commissioning; the plant needs to be grid interactive. Interconnection points to be checked and certified by GMRC/ Engineer for accuracy and safety.
- Installation of Main Meter and Back up Metre shall be done by the EPC Contractor and the EPC Contractor shall submit drawings for grid interface for each individual power pack and get approved prior to commencement of work on Project Site.
- Necessary approvals and testings of all energy metres shall be as per standards of CEIG/ DISCOM.
- Commissioning certificate from GEDA relevant authorities for the Facility.
Eligibility:
- The Bidder shall be Any Person i.e. Company, LLP, Partnership Firm, Proprietor, Public or any Private Organization etc. A copy of certificate of incorporation / Registration shall be furnished along with the bid in support of above.
Technical:
- The Bidder shall have an experience of design, supply, erection, commissioning and operation of solar Photovoltaic based grid connected power plant(s) of cumulative installed capacity of 406 KW or above in India during the last seven years ending last day of the month previous to the month of tender submission.
- The Bidders shall have an experience of design, supply, erection, commissioning and operation of solar Photovoltaic based grid connected power plant(s) capacity during last seven years ending last day of the month previous to the month of tender submission in India of;
- Single Project of 325 kW or above or
- Two Projects of 203 kW or above or
- Three Projects of 162 kW or above grid connected solar rooftop photovoltaic systems except solar lanterns / street light / Standalone systems.
- The Bidder shall also submit documentary proof of achievement of performance generation guarantee and performance of at least one rooftop solar PV power plant of 50 kW or above installed during the last seven years ending last day of the month previous to the month of tender submission in India which shall be certified from the Developer (“Client”) of that particular solar PV power plant. Performance certificate shall consist of at least Generation data, CUF, unit/kW etc. and must be issued at least one year after commissioning of the plant.
- Bidders shall submit, in support of the above, the list of projects commissioned along with their work order/ LOA and the commissioning certificates/ charging certificate from DisCom/ certificate from Third Party Inspector (TPI) of the Work Order issuing entity or any document confirming the commissioning of the plant.
- In case the Bidder wants to meet the eligibility criterion through its own power plant, then a certificate from Chartered Accountant to that effect will be required to be submitted.
The complete documents can be downloaded from www.gujaratmetrorail.com/tenders/