Kolkata Metro update: Entire TBM tunneling completed for East-West Metro project
The tunneling work gets completed by Tunnel Boring Machine (TBM) in East West Metro Corridor with the breakthrough of “Urvi“ at Bowbazar, Kolkata on 15.05.2021. With this breakthrough the entire TBM tunneling for the Kolkata […]