RVNL Update: M/s H.G. Infra Engineering Ltd. bags contract for various works including earthwork for viaducts in connection with Bhanupali-Bilaspur-Beri New Railway Line

Rail Vikas Nigam Limited (RVNL) has awarded a tender to M/s H.G. Infra Engineering Limited for “Construction of Foundations, Substructure & Superstructure along with River Training/Protection Work, Earthwork & allied works for Viaduct 1&2 in between Chainage Km 47+415 to Km 50+900, in connection with Bhanupali-Bilaspur-Beri New Railway Line in District Bilaspur of Himachal Pradesh State, India”.

More Details:

  • The bids opened on 08.12.2022 for execution of the “Construction of Foundations, Substructure & Superstructure along with River Training/Protection Work, Earthwork & allied works for Viaduct 1&2 in between Chainage Km 47+415 to Km 50+900, in connection with Bhanupali-Bilaspur-Beri New Railway Line in District Bilaspur of Himachal Pradesh State, India” for the Bid Notice No. RVNL/BBB/Bridge/PK-3/Works dated 13.09.2022 for the accepted contract amount INR 466,11,00,158.63 (Rs. Four hundred sixty-six crore eleven lakh one hundred fifty-eight and paise sixty-three only), as corrected and modified in accordance with the instructions to bidders, is hereby accepted.

Summary of Contract Price for the contract is as under:

Bill / ScheduleDescription of ScheduleBOQ Cost (Rs.)Accepted Rate %age Above / Below/At ParAmount (Rs.)
Col-1Col-2Col-3Col-4Col-5
1.1Earthwork in Formation (Standard Rates)2,20,65,875.0042.84% Below1,26,12,854.15
1.2Earthwork in Formation (Site Specific Rates)1,89,42,838.0025.33% Below1,41,44,617.13
2A.1Bridge work (Other than Steel works) (Standard Rates)15,39,69,529.7946.75% Below8,19,88,774.61
2A.2Bridge work (Other than Steel works) (Site Specific Rates)1,52,11,00,582.5226.38% Below1,11,98,34,248.85
2B.1Bridge Work (Steel items involving Fabrication and Erection) (Standard Rates)1,28,06,13,399.0007.07% Below1,19,00,74,031.69
2B.2Bridge Work (Steel items involving Fabrication and Erection) (Site Specific Rates)64,73,79,314.6915.74% Below54,54,81,810.56
2C.1Bridge Work (Supply of Steel items) (Standard Rates)1,64,82,96,760.000.75% Below1,63,59,34,534.30
6.2Buildings (Site Specific Rates)38,21,970.6037.43% Below52,52,534.20
8.2Supply of Cement (Site Specific Rates)4,52,550.0010.55% Below4,04,805.97
9.1Site Facilities (Standard Rates)2,45,51,737.483.48% Below2,36,97,337.02
10.2Other items of work not covered in Bill no. 1 to 925,00,000.0015.89% Below28,97,250.00
HRoad Work (Site Specific Rates)2,55,06,408.7809.24% Below278,63,200.95
JEnvironment Management Plan (Site Specific Rates)22,85,398.0060.00% Below9,14,159.20
Total=535,14,86,363.86466,11,00,158.63
  • The work is to be completed within 30 Months & Defect Liability Period of 6 months of actual date of commencement.
  • Bidder is requested to furnish the Performance Security as under in accordance with the condition of contract (Para 4.2 of Section-6 GCC & Para 41 of Section-1 ITB) within 28 days of receipt of Notification of Award using the Performance Security Form No. COF/3 included in Section-8 (Contract Forms) of the Bidding Document.
  • The Performance Security shall be for an amount of 3% (Three percent) of the Accepted Contract Amount excluding GST i.e. INR 11,85,02,550/- (INR Eleven crore eighty-five lakh two thousand five hundred fifty only) and in the same currency of the Accepted Contract amount in the prescribed form for the stated amount valid for a period of 28 days beyond issue of performance certificate.

Source: RVNL- Press Release | Image Credit (representational): MoR