MRVC invites tender for construction of new suburban railway station & allied works at Chikhloli in connection with 3rd & 4th line between Kalyan-Badlapur Stations of Central Railway

Mumbai Railway Vikas Corporation Limited (MRVC), under Ministry of Railways (MoR), invites E- bids for Construction of New Suburban Railway Station along with other allied works at Chikhloli in connection with proposed 3rd & 4th line between Kalyan-Badlapur Stations of Mumbai Division, Central Railway.

  • Tender Reference Number: MRVC/W/MUTP-3A/KYN-BUD/257
  • Name of Work: Construction of New Suburban Railway Station along with other allied works at Chikhloli in connection with proposed 3rd & 4th line between Kalyan-Badlapur Stations of Mumbai Division, Central Railway.
  • Approx. Cost of Work: INR 81.93 Crores
  • EMD: INR 49,84,000/-
  • Period of Work: 24 Months
  • Document Download / Sale Start Date: 10th Oct, 2023
  • Document Download / Sale End Date: 23rd Nov, 2023
  • Bid Submission Start Date: 09th Nov, 2023
  • Bid Submission End Date: 23rd Nov, 2023
  • Bid Opening Date: 23rd Nov, 2023

The 3rd & 4th line between Kalyan-Badlapur Stations:

  • The existing two lines between Kalyan and Karjat are carrying mixed traffic of Mail/express, Goods trains and also suburban services. The project is 14 Route km and will cost around Rs. 1510 Crores.
  • The Satellite towns and cities of Badlapur, Ambarnath, Ulhasnagar need proper suburban rail connection for journey to Kalyan and Mumbai. Present services are run with terminals at Ambernath, Badlapur, Karjat, Khopoli and cannot be increased due to saturation on Kalyan-Badlapur section.
  • The new suburban corridor from Kalyan to Badlapur will enable augmentation of suburban rail services and will provide much needed suburban rail connectivity to these towns and will provide the infrastructure for their development.

Recent Tenders:

  • Tender Reference Number: MRVC/EL/ELEVATORS/ABH-NRAL/2023/1
    • Name of Work: Design, manufacturing, supply, erection, testing and testing and commissioning of elevators at Ambernath and Neral.
    • Approx. Cost of Work: INR 1,05,66,858/-
    • EMD: INR 2,13,000/-
    • Period of Work: 12 Months
    • Document Download / Sale Start Date: 09th Oct, 2023
    • Document Download / Sale End Date: 16th Nov, 2023
    • Bid Submission Start Date: 02nd Nov, 2023
    • Bid Submission End Date: 16th Nov, 2023
    • Bid Opening Date: 16th Nov, 2023
  • Tender Reference Number: MRVC/W/EL/204/GS/Station Improvement
    • Name of Work: General service electrical works in connection with improvement of station at Ghatkopar, Bhandup, Mulund, Dombivali, GTBN, Chembur, Govandi and Mandkhurd of Central Railway including removal/shifting/diversion/ re-location/provision of HT/LT electrical cables, arial lines, electrical fittings, panels, electrical equipments on FOBs, elevated decks, inter-connections between Deck/ FOBs, skywalks, platforms, service/utility buildings, entry/exit, circulating areas etc.
    • EMD: INR 21,20,000/-
    • Period of Work: 1095 Days
    • Document Download / Sale Start Date: 21st July, 2023
    • Document Download / Sale End Date: 05th Sep, 2023
    • Pre-Bid Conference Date: 07th Aug, 2023
    • Bid Submission Start Date: 20th Aug, 2023
    • Bid Submission End Date: 05th Sep, 2023
    • Bid Opening Date: 05th Sep, 2023
  • Tender Reference Number: MRVC/W/MUTP-3A/KYN-BUD/255
    • Name of Work: Construction of minor and major bridges including earthwork in railway formation in filling, cutting and blanketing etc, retaining wall, drains, boundary wall and other miscellaneous works in connection with proposed 3rd & 4th line between Kalyan-Badlapur stations of Central Railway.
    • Estimated Cost of Work: INR 82.78 Crore
    • EMD: INR 50,34,000/-
    • Period of Work: 24 Months
    • Document Download / Sale Start Date: 27th July, 2023
    • Document Download / Sale End Date: 05th Sep, 2023
    • Pre-Bid Conference Date: 10th Aug, 2023
    • Bid Submission Start Date: 22nd Aug, 2023
    • Bid Submission End Date: 05th Sep, 2023
    • Bid Opening Date: 05th Sep, 2023

Mumbai Railway Vikas Corporation Limited:

Mumbai Railway Vikas Corporation Limited (MRVC Ltd.), a Public Sector Undertaking of Govt. of India under Ministry of Railways (MoR) was incorporated under Companies Act, 1956 on 12th July 1999 with an equity capital of Rs. 25 crore shared in the ratio of 51:49 between Ministry of Railways and Government of Maharashtra.

MRVC is involved in executing the suburban rail improvement projects under Mumbai Urban Transport Project (MUTP) as sanctioned by the Ministry of Railways for enhancing suburban rail transportation capacity thereby reducing the overcrowding and meeting future traffic requirements. The corporation is also involved in the planning and development of Mumbai Suburban Rail System.

The draft Terms of Reference (Draft ToR) is available at MRVC website www.mrvc.indianrailways.gov.in 


Source: MRVC- Tender | Image Credit (representational): MoR