
Search Results for tunnelling




Delhi Metro holds meeting with ITA’s President Mr. Arnold Dix on various challenges and innovations in tunnelling
Mr. Arnold Dix, President International Tunneling and Underground Space Association (ITA) visited the Delhi Metro headquarters and had an interaction meeting with Dr. Mangu Singh, who is the President of the Tunneling Association of India […]

Delhi Metro’s Centre of Excellence for Tunnelling & Underground Space Engineering (CETUSE) to be set up at Shastri Park
The Delhi campus of the Centre of Excellence for Tunnelling & Underground Space Engineering (CETUSE) shall be set at the Delhi Metro Rail Academy (DMRA) in Shastri Park. This facility shall be an integral part […]

Chennai Metro Update: Tunnelling commences at Greenways Road Station in corridor 3 of Phase-2
Chennai Metro Rail Limited tunnelling commenced at Greenways Road Station in Corridor 3 contract TU02 Kellys to Taramani of Phase –II Chennai Metro Rail Project. More Details: Chennai Metro Rail Limited has commenced the expansion […]

MMRC completes 100% tunnelling work at Mumbai Central metro station of Metro Line-3
Mumbai Metro Rail Corporation (MMRC), achieved its 42nd and final Breakthrough on the Colaba-Bandra-SEEPZ Metro-3 corridor at its Mumbai Central Metro Station. More Details: Robbins made TBM Tansa-1 completed its most challenging drive of 837 […]

Delhi Metro completes tunnelling work between Krishna Park Extension and Keshopur on magenta line of Phase-4
The Delhi Metro Rail Corporation (DMRC) achieved a major construction milestone in Phase-4 with the completion of tunnelling work between Krishna Park Extension and Keshopur on the Janakpuri West – RK Ashram Marg corridor. More […]

TERRATEC EPBMs ready for underground tunnelling for UPMRC corridor-1 of Kanpur MRTS project
TERRATEC celebrated the successful site acceptance testing of two 6.52m diameter Earth Pressure Balance Tunnel Boring Machines (EPBMs) for Uttar Pradesh Metro Rail Corporation (UPMRC) for the Corridor-1 of Kanpur MRTS Project (KNPCC-05) in India. […]

RRTS Update: Tunnelling work moves into next phase with construction of 1.5 km long tunnel from Anand Vihar to New Ashok Nagar
RRTS tunnelling work for India’s first Regional Rail moves into the next phase with the construction of around 1.5 km long tunnel by Sudarshan 4.1 (Tunnel Boring Machine) from Anand Vihar to New Ashok Nagar. […]