RVNL invites tender for various works including execution of balance civil works between Rayagada-Bobbili in connection with Vizianagaram-Titlagarh third line project

Rail Vikas Nigam Limited (RVNL) has invited bids for Execution of balance civil works, standardisation of level crossings and circulating area works in between Rayagada-Bobbili in connection with Vizianagaram-Titlagarh Third Line Project.

  • Tender Reference Number: RVNL/CPM/WAT/TIG-VZM/3rd Line/PKG-4/2023/OT-3
  • Name of Work: Execution of balance civil works, standardisation of level crossings and circulating area works in between Rayagada-Bobbili in connection with Vizianagaram-Titlagarh Third Line Project.
  • Estimated Cost: INR 35.86 Crore
  • EMD: INR 71,72,000/-
  • Period of Work: 18 Months
  • Document Download / Sale Start Date: 23rd June, 2023
  • Document Download / Sale End Date: 26th July, 2023
  • Bid Submission Start Date: 23rd June, 2023
  • Bid Submission End Date: 26th July, 2023
  • Bid Opening Date: 26th July, 2023

Recent Tenders:

  • Tender Reference Number: RVNL-SNT-KOL-S05
    • Name of Work: Independent Safety Assessment (ISA) services for train control and signalling system of Line-3/Purple Line (Joka-Esplanade-16 Kms) and Line-6/Orange Line (Kavi Subhash-Biman Bandar/Jai Hind-32 Kms) of Metro Railway Kolkata Project in West Bengal State, India.
    • Estimated Cost: INR 4,20,81,461.70 Crore
    • EMD: INR 12,62,400/-
    • Period of Work: 48 Months
    • Document Download / Sale Start Date: 19th June, 2023
    • Document Download / Sale End Date: 03rd July, 2023
    • Bid Submission Start Date: 27th June, 2023
    • Bid Submission End Date: 03rd July, 2023
    • Bid Opening Date: 03rd July, 2023
  • Tender Reference Number: RVNL-NGP-YTL-NED-Pkg-IIIA
    • Name of Work: Construction of road bed, major bridges, minor bridges, ROBs, RUBs, including road approaches, station buildings, staff quarters, other service buildings, HL platforms, COPs, FOBs, general electrical work and other works related to construction of Yavatmal-Nanded New BG Line from Km: 157 to Km: 183 of Central Railway in Maharashtra state including construction of two tunnels: T1 (1250m) & T2 (2700 m) with BLT in tunnels.
    • Estimated Cost: INR 827.53 Crore
    • EMD: INR 02 Crore
    • Period Of Work: 36 Months
    • Document Download / Sale Start Date: 31st May, 2023
    • Document Download / Sale End Date: 17th July, 2023
    • Pre-Bid Conference Date: 15th June, 2023
    • Bid Submission Start Date: 11th July, 2023
    • Bid Submission End Date: 17th July, 2023
    • Bid Opening Date: 17th July, 2023
  • Tender Reference Number: RVNL_LKO_PFM-JNH_E-476
    • Name of Work: Installation and linking of BG railway track, P. way material supply, track ballast supply, mobile flash butt welding of joints and all other associated P-way works (excluding supply of rails, line/ordinary wider base PSC sleepers) in section between Janghai (excluding) to Phaphamau (excluding) in connection with doubling of 46.79 km railway track in Janghai-Phaphamau section on Lucknow Division of Northern Railway in Jaunpur/Prayagraj Districts of Uttar Pradesh, being executed under CPM/RVNL/Lucknow.
    • Estimated Cost: INR 127.76 Crore
    • EMD: INR 02 Crore
    • Period Of Work: 24 Months
    • Document Download / Sale Start Date: 31st May, 2023
    • Document Download / Sale End Date: 26th June, 2023
    • Bid Submission Start Date: 31st May, 2023
    • Bid Submission End Date: 26th June, 2023
    • Bid Opening Date: 26th June, 2023

About Vizianagaram-Titlagarh Third Line Project:

  • The 3rd line between Vizianagaram – Titlagarh has been sanctioned during 2015-2016 as a throughput enhancement project by the Ministry of Railways under the jurisdiction of East Coast Railway.
  • As doubling is in progress between Sambalpur to Titlagarh with earlier sanction, the 3rd line is proposed between Titlagarh to Vizianagaram where the existing Double line is fully utilised to its section capacity.
  • The objective of the project is to cater to the increase in freight traffic due to upcoming major projects in Power sector, Industry, Mineral, and Agricultural fields in Western Orissa in the industrial corridor along Visakhapatnam to Jharsuguda and also to provide an alternative route to mineral-rich area of Koraput – Kirandol and once completed opens an alternative route to oversaturated Kuragpur – Jharsuguda section of Howrah – Mumbai GT route and Howrah – Chennai Mainline.
  • The projected total additional site traffic considered for the project is 48.92 Million Ton at an estimated ROR of 16.74%. The project covers 26 block sections between Titlagarh to Vizianagaram and also a Bypass line between Gotlam station (RV line) and Nellimarla station (on HWH – VSKP Main line).

About RVNL:

  • The company began its operation in 2005 with the appointment of a Board of Directors.
  • The company was granted Miniratna status in September 2013.
  • RVNL has been rated “Excellent” for the 9 successive years by the Department of Public Enterprises.
  • RVNL has also been ranked 1st amongst the Railway PSEs for the 4 times out of the last 5 years.
  • The turnover of the company for the financial year 2019-20 has increased by 44.44%.
  • The authorised share capital of the company is Rs. 3000 cr. with paid up share capital of Rs. 2085 cr.
  • The company has been listed after its disinvestment of its stake of 12.16% of the company through IPO.

Tender documents can be downloaded from website https://rvnl.org/active-tenders-new


Source: RVNL- Tender | Image Credit: RVNL