![](https://news.railanalysis.com/wp-content/uploads/2024/06/Kanpur-Metro-begins-pier-cap-casting-for-the-elevated-section-of-Corridor-20A-326x245.png)
Kanpur Metro begins pier cap casting for the elevated section of Corridor-2
In a bid to ensure seamless construction, Kanpur Metro commences the casting of first pier cap for the elevated section of Corridor-2 stretching from Chandrashekhar Azad (CSA) University of Agriculture to Barra 8. All girders […]