
Chennai Metro launches 1st Tunnel Boring Machine (TBM) for Corridor 4 of Phase 2 at Light House Station
The 1st Tunnel construction in Corridor 4 for a total length of 1.96 km was commenced from Light House to Thirumayilai Metro by TBM Flamingo lowered in the south shaft–down line. More Details: Chennai Metro […]