RRTS Update: Third successful tunnel breakthrough between Bhaisali to Meerut Central
The Delhi-Ghaziabad-Meerut RRTS corridor witnessed its third successful tunnel Breakthrough in Meerut. More Details: Sudarshan 8.2 (Tunnel Boring Machine) constructed this 2 km long tunnel between Bhaisali to Meerut Central and made a breakthrough through […]