Pune Metro Update: Tender invited for development of land near Swargate Metro Station

Maharashtra Metro Rail Corporation Limited (MMRCL) has invited tenders for Development and operations of part of land at final plot no. 499 of Parvati TP scheme near Swargate Metro Station of Pune Metro Rail Project on Public Private Partnership (DBFOT) Basis.

  • Tender Reference Number: P1PD- 17/2023
  • Name of Work: Development and operations of part of land at final plot no. 499 of Parvati TP scheme near Swargate Metro Station of Pune Metro Rail Project on Public Private Partnership (DBFOT) Basis.
  • EMD: INR 82 Lakh
  • Document Download Start Date: 24th April, 2023
  • Document Download End Date: 24th May, 2023
  • Pre-bid Meeting: 04th May, 2023
  • Bid Submission Start Date: 24th April, 2023
  • Bid Submission End Date: 24th May, 2023
  • Bid Opening Date: 24th May, 2023

Recent Tenders:

  • Tender Reference Number: P1PD-18/2023
    • Name of Work: Awarding exclusive display of advertisements on 4 Nos. of Pune Metro trainset for the corridor 1 – from PCMC to Swargate and 12 Nos. of trainsets for corridor -2 Vanaz to Ramwadi under Pune Metro Rail Project for a period of three years.
    • License Period: 03 Years
    • Document Download Start Date: 12th April, 2023
    • Document Download End Date: 12th May, 2023
    • Pre-bid Meeting: 20th April, 2023
    • Bid Submission Start Date: 12th April, 2023
    • Bid Submission End Date: 12th May, 2023
    • Bid Opening Date: 12th May, 2023
  • Tender Reference Number: P1-O&M-03/2023
    • Name of Work: Providing services of mechanised housekeeping cleaning, Ticketing (TOM/EFO Management), security services for a period of 2 years for 29 stations of Pune Metro Rail Project, & mechanised housekeeping cleaning, security services for a period of 2 years at Range Hill Depot & Hill View Park Car Depot of Pune Metro Rail Project, and cleaning & washing of Rolling Stock (34 Train Sets) for a period of 2 years.
    • EMD: INR 25 Lakh
    • Document Download Start Date: 08th April, 2023
    • Document Download End Date: 08th May, 2023
    • Pre-bid Meeting: 18th April, 2023
    • Bid Submission Start Date: 08th April, 2023
    • Bid Submission End Date: 08th May, 2023
    • Bid Opening Date: 08th May, 2023
  • Tender Reference Number: P1TL-04/2023
    • Name of Work: Licensing of Spare Optical Fibre Cable (OFC) and Space for Fibre Cable at elevated viaduct and underground tunnel on lease in Pune Metro Rail Project.
    • EMD: INR 12 Lakh
    • Document Download Start Date: 14th March, 2023
    • Document Download End Date: 29th March, 2023
    • Pre-bid Meeting Date: 21st March, 2023
    • Bid Submission Start Date: 14th March, 2023
    • Bid Submission End Date: 29th March, 2023
    • Bid Opening Date: 29th March, 2023

About Pune Metro Rail Project:

  • Pune Metro Rail Project was sanctioned by GoI & GoM in December 2016 and the foundation stone was laid by Hon’ble Prime Minister Shri Narendra Modi on 24th December 2016. The project work commenced on 3rd May 2017.
  • Pune Metro Rail Project consists of two corridors, North- South Corridor (Purple line) and East-West Corridor (Aqua line) with a total length of 33.2 km and 30 stations. The length of the elevated section is 27.2 km and length of the underground section is 6 km.
  • There are 2 maintenance depots, one each at Range Hills and Vanaz. Once fully operational, its services will be run with 34 metro trains in three car train configurations.
  • North-South Corridor from PCMC to Swargate (Purple Line): This Corridor passes through the industrial area of Pimpri-Chinchwad and further into old Peth areas of Pune city. The Length of this corridor is 17.5 km with 14 stations. Due to extremely congested Shivaji Nagar and Old Peth areas with very narrow roads in most of the areas, the 6 Km section from Range Hills to Swargate is underground.
  • East-West Corridor from Vanaz to Ramwadi (Aqua Line): This fully elevated Corridor starts from Vanaz Depot in the east and passes through the densely populated residential areas of Pune city. There are a total 16 nos. of Metro Stations and the total length of this corridor is 15.7 Kms. This Corridor also has a double decker flyover length 600 mts between Nal Stop and Abhinav chowk which is being constructed for Pune Municipal Corporation on deposit basis to deviate traffic congestion between important junctions at Nal Stop and Abhinav chowk.
  • Depots: Pune Metro has two maintenance depots for upkeep of trains. The depot on NS corridor at Range Hills is named as Range Hills Car Depot and the depot on EW corridor at Vanaz is named as Hill View Park Car Depot.

Sale of document, e-payment procedure, submission and other details are available on MAHA-Metro (Nagpur) E- tender portal under section in e- tenders. https://mahametrorail.etenders.in


Source: Pune Metro- Tender | Image Credit (representational): Pune Metro