Northern Railway overhauled 568 level crossings; 36,440 km track tested for faults during lockdown
As the passenger trains stopped running with the announcement of lockdown in the country the rail traffic on the vast network of Indian Railways was minimized. During the lockdown period of mid-March-May, only the goods, […]