![](https://news.railanalysis.com/wp-content/uploads/2020/12/Chennai-Metro-1-326x245.jpg)
HCC-KEC JV bags contract for construction of 11 elevated stations in corridor-5 of Phase-2 project
The Chennai Metro Rail Limited (CMRL) has issued a Letter of Acceptance (LOA) to M/s. HCC-KEC Consortium for the work Construction of Elevated Viaduct of Approximately 11.61 km length from Ch: 33710 m to 45320 […]