Flat Preloader Icon
  • Rail Magazine
    • Magazine Details
    • Read Our Magazine
    • Advertise with us
    • Contribute Article
  • Rail & Metro Conclave
    • Register as Speaker
    • About the Event
  • Rail & Metro Awards
    • More Details
    • Winners 2019
    • Participate for 2020
  • Research Services
  • Back to Main Site

Rail Analysis India

Gateway to the Rail and Metro Sector in India

  • Home
  • News
  • Covid-19 Response
  • Interviews
  • Videos
  • Press Release
  • Submit Article
  • Rail Magazine
    • Subscribe Our Magazine
    • Read Latest Magazine
    • Advertise with us
    • Contribute Article
  • Research
  • More
    • Rail & Metro Awards 2024
    • Rail & Metro Technology Conclave 2023
    • Product Expertise
    • Articles
    • Recruitment
    • Technologies
    • Case Study
    • Executive Appointments
    • Events
    • Opportunities
      • Tenders
      • Project Insights
  • Mainline
    • Traditional Railways
    • Indian Railways
    • Engines & Locomotives
    • Rolling Stock
    • Safety and Security
  • Metro & Urban Transit
    • Operational Metro
      • Ahmedabad Metro
      • Bangalore Metro
      • Chennai Metro
      • Delhi Metro
      • Gurgaon Metro
      • Hyderabad Metro
      • Jaipur Metro
      • Kochi Metro
      • Kolkata Metro
      • Lucknow Metro
      • Mumbai Metro
      • Nagpur Metro
      • Noida Metro
    • Under-Construction Metro
      • Agra Metro
      • Bhopal Metro
      • Indore Metro
      • Kanpur Metro
      • Meerut Metro
      • Navi Mumbai Metro
      • Patna Metro
      • Pune Metro
      • Surat Metro
    • Under-Planning Metro
      • Guwahati Metro
      • Gwalior Metro
      • Kozhikode Light Metro
      • Ludhiana Metro
      • Srinagar Metro
      • Thiruvananthapuram Light Metro
      • Uttrakhand Metro
      • Varanasi Metro
      • Vijaywada Metro
      • Visakhapatnam Metro
    • Monorail
      • Mumbai Monorail
  • Infrastructure
    • Station Redevelopment
    • Track
    • Infrastructure
    • Bridges & Tunnels
    • Planning and Design
    • Signalling & Telecom
    • IT
    • Ticketing
  • Semi High Speed
    • RRTS : Under-Construction Corridors
      • Delhi-Ghaziabad-Meerut
    • RRTS : Under-Planning Corridors
      • Delhi-Sonipat-Panipat
      • Delhi-Gurugram-Rewari-Alwar
      • Delhi-Faridabad-Ballabgarh-Palwal
      • Ghaziabad-Khurja
      • Delhi-Bahadurgarh-Rohtak
      • Ghaziabad-Hapur
      • Delhi-Shandara-Baraut
    • Semi HSR: Under-Planning
      • Delhi-Agra
      • Delhi-Chandigarh
      • Delhi-Kanpur
      • Nagpur-Bilaspur
      • Mysore-Bengaluru-Chennai
      • Mumbai-Goa
      • Chennai-Hyderabad
      • Nagpur-Secunderabad
    • Train 18
    • Train 20
  • High Speed Rail
    • High Speed Rail : Under-Construction
      • Mumbai-Ahmedabad
    • High Speed Rail : Under-Planning
      • Delhi–Kolkata
      • Delhi–Amritsar
      • Delhi–Dehradun
      • Delhi–Jodhpur
      • Howrah–Haldia
      • Mumbai–Nagpur
      • Ahmedabad–Dwarka
      • Rajkot–Veraval
      • Chennai–Hyderabad
      • Chennai–Thiruvananthapuram
      • Chennai–Kanniyakumari
      • Bengaluru–Mysuru
      • Thiruvananthapuram–Kannur
  • Hyperloop
  • Freight Corridor
    • Freight
  • Manufacturing in India
Latest News
  • [ December 8, 2023 ] CONCOR and NTPC Vidyut Vyapar Nigam Limited (NVVN) sign MoU to develop solar projects in terminals Rail News
  • [ December 8, 2023 ] Chennai Metro invites tender for the supply and installation of automatic gates with system integrator for Phase-1 stations Rail News
  • [ December 8, 2023 ] RITES and Meghalaya Industrial Development Corporation Limited (MIDC) sign MoU to provide PMC services to boost multimodal logistics projects Rail News
  • [ December 7, 2023 ] Status of electrification of the Railway projects of around 10 years stood at 38,650 Rkm costing Rs. 3,534 Cr (Final) Rail News
  • [ December 7, 2023 ] RITES invites tender for geotechnical investigation for the final location survey of New BG railway line projects and various lines over Eastern Railway Rail News

Search Results for Anand Vihar

Rail News

RRTS Update: Shri Ashish Kundra and Ms. Shilpa Shinde visit Sarai Kale Khan and Anand Vihar stations of the Delhi-Ghaziabad-Meerut RRTS corridor

October 10, 2023

Shri Ashish Kundra, Principal Secretary-cum-Commissioner, Transport Department, GNCTD, along with Ms. Shilpa Shinde, Managing Director, Delhi Transport Corporation, visited Sarai Kale Khan and Anand Vihar stations of the Delhi-Ghaziabad-Meerut RRTS corridor. More Details: Shri Ashish […]

Rail News

Delhi Metro Update: Tender invited for consultancy services for redevelopment of ISBT at Anand Vihar and Sarai Kale Khan

July 22, 2023

Delhi Metro Rail Corporation Limited (DMRC) has invited open e-tenders from eligible applicants, who fulfil qualification criteria for Consultancy services for redevelopment of ISBT at Anand Vihar and Sarai Kale Khan. Tender Reference Number: CW/ISBT-01 […]

Rail News

RRTS Update: NCRTC to build bridges for pedestrian & entry-exit of vehicles at Anand Vihar RAPIDX Station

June 1, 2023

A dedicated pedestrian bridge is being constructed at Anand Vihar RAPIDX station of the Delhi-Ghaziabad-Meerut RRTS corridor. Apart from this, two separate bridges are also being built for segregated entry and exit of vehicles into […]

Rail News

RRTS Update: UK Foreign & Commonwealth Development Office (FCDO) officials visit Anand Vihar and Duhai Depot

November 21, 2022

A delegation of officials from UK Foreign & Commonwealth Development Office (FCDO) visited NCRTC’s corporate office GatiShakti Bhawan and held discussions with the Managing Director and Directors of NCRTC. More Details: The UK FCDO manages […]

Rail News

RRTS Update: Construction of Anand Vihar RRTS station progressing rapidly

November 11, 2022

The construction of Anand Vihar RRTS station, one of the largest stations on the  Delhi-Ghaziabad-Meerut corridor, is progressing rapidly. The base slab and concourse level of this station have been completed and the construction of […]

Rail News

RRTS Update: Tunnelling work moves into next phase with construction of 1.5 km long tunnel from Anand Vihar to New Ashok Nagar

September 28, 2022

RRTS tunnelling work for India’s first Regional Rail moves into the next phase with the construction of around 1.5 km long tunnel by Sudarshan 4.1 (Tunnel Boring Machine) from Anand Vihar to New Ashok Nagar. […]

Rail News

NCRTC invites bids for consultancy services for preparation of Influence Zone Plan for Anand Vihar and Karkardooma metro stations for Delhi–Meerut RRTS corridor

July 22, 2022

National Capital Region Transport Corporation Ltd. (NCRTC) has invited limited e-bids (Electronic Bid) (Manual bid are not permitted) from shortlisted firms under Single Stage Two Packet System for Consultancy services for preparation of Influence Zone […]

Rail News

RRTS Update: Anand Vihar RRTS station of the Delhi-Ghaziabad-Meerut corridor will be only one level below ground for commuter’s convenience

July 13, 2022

The upcoming Anand Vihar RRTS station of the Delhi-Ghaziabad-Meerut RRTS corridor will have the distinction of being the only RRTS station to be constructed only one level below the ground level. More details: This unique […]

Rail News

RRTS Update: Third Sudarshan TBM starts tunnel construction work from Anand Vihar towards Sahibabad

June 27, 2022

A Sudarshan (Tunnel Boring Machine) has started tunnelling work in the direction of Sahibabad from Anand Vihar station on the Delhi-Ghaziabad-Meerut RRTS corridor. Two Sudarshan (TBM) are already working on tunnel construction from Anand Vihar […]

Rail News

Delhi Metro update: RFP invited for Property Development at Anand Vihar Metro Station on Line-4

September 28, 2021

The Delhi Metro Rail Corporation (DMRC) has invited a request for proposal (RFP) for Property Development at Anand Vihar Metro Station (Line-4). Tender Reference Number: CPD-87R Name of Work: Property Development at Anand Vihar Metro […]

Posts navigation

1 2 … 11 »

Check Out Our Updates :

Latest News

Interviews

Articles

Product Expertise Insights

 

Latest Insights

  • CONCOR and NTPC Vidyut Vyapar Nigam Limited (NVVN) sign MoU to develop solar projects in terminals
    December 8, 2023
  • Chennai Metro invites tender for the supply and installation of automatic gates with system integrator for Phase-1 stations
    December 8, 2023
  • RITES and Meghalaya Industrial Development Corporation Limited (MIDC) sign MoU to provide PMC services to boost multimodal logistics projects
    December 8, 2023
  • Status of electrification of the Railway projects of around 10 years stood at 38,650 Rkm costing Rs. 3,534 Cr (Final)
    December 7, 2023
  • RITES invites tender for geotechnical investigation for the final location survey of New BG railway line projects and various lines over Eastern Railway
    December 7, 2023
  • OSOP Update: Around 1189 ‘One Station One Product’ outlets are operational at 1083 Railway Stations
    December 7, 2023
  • NCRTC invites tender for maintenance of vehicle with integration of signalling system for Delhi-Ghaziabad-Meerut RRTS Corridor
    December 7, 2023

UPCOMING EVENT:

READ OUR MAGAZINE

LATEST VIDEOS & HIGHLIGHTS

Subscribe to Rail Analysis Newsletter

Latest News

  • Rail News

    Chennai Metro invites tender for the supply and installation of automatic gates with system integrator for Phase-1 stations

  • Rail News

    RITES and Meghalaya Industrial Development Corporation Limited (MIDC) sign MoU to provide PMC services to boost multimodal logistics projects

  • Rail News

    Status of electrification of the Railway projects of around 10 years stood at 38,650 Rkm costing Rs. 3,534 Cr (Final)

  • Rail News

    RITES invites tender for geotechnical investigation for the final location survey of New BG railway line projects and various lines over Eastern Railway

  • Rail News

    OSOP Update: Around 1189 ‘One Station One Product’ outlets are operational at 1083 Railway Stations

  • Rail News

    NCRTC invites tender for maintenance of vehicle with integration of signalling system for Delhi-Ghaziabad-Meerut RRTS Corridor

  • Rail News

    Bangalore Metro Update: Tunnel Boring Machine-TUNGA successfully achieves breakthrough at Kadugondanahalli Station

RECEIVE REGULAR UPDATES ON YOUR EMAIL

Join Rail Analysis Social Network

 Twitter (36.2K Followers)
————————————–
 Linkedin (31,500+ Followers)
————————————–
 Facebook (12,000+ Followers)
————————————–
 Youtube (1,500 Subscribers)

Latest Updates

  • CONCOR and NTPC Vidyut Vyapar Nigam Limited (NVVN) sign MoU to develop solar projects in terminals
    December 8, 2023
  • Chennai Metro invites tender for the supply and installation of automatic gates with system integrator for Phase-1 stations
    December 8, 2023
  • RITES and Meghalaya Industrial Development Corporation Limited (MIDC) sign MoU to provide PMC services to boost multimodal logistics projects
    December 8, 2023
  • Status of electrification of the Railway projects of around 10 years stood at 38,650 Rkm costing Rs. 3,534 Cr (Final)
    December 7, 2023
  • RITES invites tender for geotechnical investigation for the final location survey of New BG railway line projects and various lines over Eastern Railway
    December 7, 2023
  • OSOP Update: Around 1189 ‘One Station One Product’ outlets are operational at 1083 Railway Stations
    December 7, 2023
  • NCRTC invites tender for maintenance of vehicle with integration of signalling system for Delhi-Ghaziabad-Meerut RRTS Corridor
    December 7, 2023

Latest News

Interviews

Articles

Product Expertise Insights

 

  • Terms & Conditions
  • Copyright
  • Submission Policy
  • Payment Policy
  • Privacy Policy
  • Expert Code Compliance
  • Disclaimer
  • Cookies
Connect with our network :
  • Facebook
  • Google Plus
  • Instagram
  • Linkedin
  • Pinterest
  • Twitter

Contact us :

Rail Analysis India

Email : info@railanalysis.com .
Tel : +919811979598 / + 919811979599
New Delhi , India

2019 All Rights Reserved | Rail Analysis India